BRINGUP.md is the cold-start reference: project status (audit phases 0-5 complete, Phase 6 spike achieved - first grblHAL-commanded motion 2026-07-26), bench/board access, build+deploy procedures, the step backend runbook incl. the required analog machine config, the measured hardware facts bank, and the ordered next-work list. scripts/bench/ preserves the hardware-verification tools (underrun feeder, end-of- data protocol bench, PWM register check, cross-build scripts).
17 lines
1.3 KiB
Markdown
17 lines
1.3 KiB
Markdown
# ForgeFIRM bench tools
|
||
|
||
Hardware-verification tools for the ForgeFIRM bench. All run ON the
|
||
target board (dev image, python3 present) unless noted.
|
||
|
||
| Tool | Purpose |
|
||
|---|---|
|
||
| `feeder.c` | Spike-step-3 underrun proof: streams NOP pulse bytes to `/dev/glowforge` with wall-clock pacing, bounded queue depth, deadman flock, SCHED_FIFO. Usage: `feeder <hz> <seconds> <depth_ms>`. Passed 100 kHz × 120 s under full load with 0.2 ms worst write latency. Cross-compile with `build-feeder.sh` (WSL). |
|
||
| `bench_phase2.py` | End-of-data protocol bench (audit M2–M5): underrun detection/ack, parked no-replay guard, resume(0), continuous-feed stability, 20× run/underrun cycles. Motion-safe (motors locked, laser latched). 16/16 PASS on 2026-07-26. |
|
||
| `check_pwm.py` | Laser PWM register check (audit M8): reads PWM2 PWMCR/PWMPR via /dev/mem, expects divider 13 × ~127 counts ≈ 40 kHz. The scope on LASER_PWM remains the final pre-live-fire gate. |
|
||
| `build-feeder.sh` | Cross-compiles `feeder.c` the same way. |
|
||
|
||
The build scripts borrow the Yocto cross toolchain + sysroot from the ulfius
|
||
2.7.15 work directory in the WSL build tree; if that path ages out after a
|
||
`bitbake -c clean`, point `TC` at any current target recipe workdir (or build
|
||
a proper SDK with `bitbake meta-toolchain`).
|