ScottW514 1a5fc27530 docs: bring-up runbook + bench tools from the audit corrective work
BRINGUP.md is the cold-start reference: project status (audit phases
0-5 complete, Phase 6 spike achieved - first grblHAL-commanded motion
2026-07-26), bench/board access, build+deploy procedures, the step
backend runbook incl. the required analog machine config, the measured
hardware facts bank, and the ordered next-work list. scripts/bench/
preserves the hardware-verification tools (underrun feeder, end-of-
data protocol bench, PWM register check, cross-build scripts).