BRINGUP: the lid-IR fire gate is set on the bench

This commit is contained in:
ScottW514
2026-08-15 08:58:01 -04:00
parent e1207316ec
commit 744376d8e8
+4 -1
View File
@@ -260,7 +260,10 @@ that day read ~57–64 vs 37–40 on 08-14 (day-to-day drift ≈ +22 counts),
which is why the gate keys off the run-start baseline and never off an
absolute level. `cool_fire_ir_delta = 15` is the sized gate (≥ 2× the
worst cut rise, at the ~15-count floor); it is a hand-edited
`/data/forgefirm.conf` key and takes effect at the next run start. A
`/data/forgefirm.conf` key, **set on the bench 2026-08-15** (verified
present, file 0600), and takes effect at the next run start — the fire
watch is armed from here on and the next real jobs are the false-trip
watch. A
flame-signature measurement (tea light in the closed bed, idle) was not
made; the gate stands on the cut data alone until one is. **Armed kill on
the expected-stop path — first run FAILED, defect fixed, re-run PASS.**