From 744376d8e8ddf9d71791f3809e11986fd4f5eaea Mon Sep 17 00:00:00 2001 From: ScottW514 Date: Sat, 15 Aug 2026 08:58:01 -0400 Subject: [PATCH] BRINGUP: the lid-IR fire gate is set on the bench --- docs/BRINGUP.md | 5 ++++- 1 file changed, 4 insertions(+), 1 deletion(-) diff --git a/docs/BRINGUP.md b/docs/BRINGUP.md index ffe4627..c0838ce 100644 --- a/docs/BRINGUP.md +++ b/docs/BRINGUP.md @@ -260,7 +260,10 @@ that day read ~57–64 vs 37–40 on 08-14 (day-to-day drift ≈ +22 counts), which is why the gate keys off the run-start baseline and never off an absolute level. `cool_fire_ir_delta = 15` is the sized gate (≥ 2× the worst cut rise, at the ~15-count floor); it is a hand-edited -`/data/forgefirm.conf` key and takes effect at the next run start. A +`/data/forgefirm.conf` key, **set on the bench 2026-08-15** (verified +present, file 0600), and takes effect at the next run start — the fire +watch is armed from here on and the next real jobs are the false-trip +watch. A flame-signature measurement (tea light in the closed bed, idle) was not made; the gate stands on the cut data alone until one is. **Armed kill on the expected-stop path — first run FAILED, defect fixed, re-run PASS.**