BRINGUP: record audit Phase 5 (physical-evidence instrumentation)
Emission witness, lid IR fire watch (watch-only until characterized), faults/HV telemetry, measure-laser cleanup, and the head I2C error fix (rides the pending image flash); bench items listed.
This commit is contained in:
+36
-1
@@ -1,11 +1,46 @@
|
||||
# ForgeFIRM bring-up status & cold-start runbook
|
||||
|
||||
Last updated: **2026-08-14** — **audit remediation Phases 0 through 4
|
||||
Last updated: **2026-08-14** — **audit remediation Phases 0 through 5
|
||||
landed** (from an independent whole-tree audit dated 2026-08-13; the
|
||||
remediation is sequenced behind two gates — GATE A, uncommanded energy,
|
||||
before any further live-fire; GATE B, control surface + release, before
|
||||
any published release).
|
||||
|
||||
**Phase 5 (physical-evidence instrumentation) is code-complete and
|
||||
host-verified.** The machine now watches what it *does*, not just what
|
||||
it commanded. The cooling engine's 1 Hz tick runs the witnesses:
|
||||
`cnc/laser_on_sampled` — the sampled, gated output of the hardware
|
||||
AND-gate — is the emission ground truth, and emission sensed with no
|
||||
armed window in the recent past stops motion and locks the latch
|
||||
(repeating while the evidence persists); laser power-good degradation
|
||||
during an armed window warns once per session; `cnc/faults`
|
||||
transitions are warned during a run; `pic/hv_current` (the only live
|
||||
HV telemetry) is ranged per job (A-1, A-4, A-5). The GRBL controller
|
||||
carries its own in-process witness: emission sensed while the armed
|
||||
window is closed relocks the latch and raises an alarm (A-1 ctrl
|
||||
half). The four `pic/lid_ir_*` channels are polled every tick — each
|
||||
job logs baseline and peaks (the characterization dataset), and the
|
||||
fire-abort gate (`cool_fire_ir_delta`: sustained rise above run-start
|
||||
baseline → motion stopped, latch locked, verdict `FIRE` + hold, smoke
|
||||
airflow held) **ships watch-only (delta 0) until the sensors are
|
||||
characterized on the bench** (A-2). `/status` exposes the sampled
|
||||
evidence, faults, HV, and lid IR; the panel's latch row is relabeled
|
||||
*commanded* with sensed emission and power rows beside it. Cloud: a
|
||||
failed head capture can no longer leave the measure laser lit — the
|
||||
capture runs under try/finally and `_action_cleanup` extinguishes the
|
||||
head emitters (C-3). Kernel (rides the pending image flash): the head
|
||||
I²C read helpers return signed values with errno propagated, so a bus
|
||||
glitch reads as an error instead of `beam_detect_analog=65531` /
|
||||
`accel_irq=1` — the witnesses can no longer be spoofed by a failed
|
||||
read (K-11). Host verification: forgectrl and the controller build
|
||||
clean, stream harness all-PASS byte-identical, cloud client
|
||||
byte-compiles. **Bench items:** command a fire window and confirm
|
||||
`laser_on_sampled` tracks it (and confirm the idle-state PGOOD
|
||||
polarity for the panel row); force a head I²C error and confirm the
|
||||
witnesses report error, not a positive; baseline the lid IR channels
|
||||
across real jobs and set `cool_fire_ir_delta`; confirm a failed head
|
||||
capture leaves the measure laser off.
|
||||
|
||||
**Phase 4 (stale-gate cluster) is code-complete and host-verified; all
|
||||
of it is hot-deployable (no kernel rows).** The operator-armed window
|
||||
is now **job-based**, not 60-second-idle-based: it closes at program
|
||||
|
||||