Retire next-work item 3: the debug-kernel drills passed
Load/unload under DEBUG_MUTEXES (three clean cycles) and the forced -EPROBE_DEFER unwind both passed on the debug-kernel image, no lock splat, machine recovered (CAMPAIGN-LOG has the run). BRINGUP: the item closes, items 4 and up move down one.
This commit is contained in:
@@ -4979,6 +4979,33 @@ userspace i2c-dev serialize under the adapter lock, so flooding the bus
|
||||
does not collide on the wire - the head reset is the reachable way to
|
||||
make a present head answer badly.
|
||||
|
||||
## 2026-08-31: the debug-kernel drills, on the lock-debugging image
|
||||
|
||||
Both drills passed on the debug-kernel image
|
||||
(forgefirm-image-dev-debug-glowforge.rootfs-20260831203241, kernel
|
||||
`DEBUG_MUTEXES=y PROVE_LOCKING=y LOCKDEP=y DEBUG_ATOMIC_SLEEP=y
|
||||
DEBUG_SPINLOCK=y`, verified in /proc/config.gz).
|
||||
|
||||
**Load/unload.** forgectrl stopped, `glowforge.ko` unloaded and reloaded
|
||||
three times with a rail-settle between; each cycle clean, and the kernel
|
||||
log over the three carried no lock splat.
|
||||
|
||||
**Forced `-EPROBE_DEFER`.** The cnc device unbound, its 40 V regulator
|
||||
(`regulators:40v` on `reg-fixed-voltage`) unbound, then cnc re-bound:
|
||||
the probe deferred (cnc did not bind while the regulator was gone) and
|
||||
its devm unwind left the log free of splats; restoring the regulator
|
||||
let the deferred probe complete and cnc bind again.
|
||||
|
||||
The machine ended healthy: cnc idle, the GRBL controller running with
|
||||
motion verified, the head present, and no BUG/WARNING/lockdep splat
|
||||
anywhere after the first drill mark. Both drills cycle the 40 V rail (5
|
||||
`40V on` events across the session) and the drivers came back each time.
|
||||
Three bench facts hardened the drill in the running (forgefirm 2319735):
|
||||
the splat filter ignores the benign lockdep boot banner, the regulator
|
||||
search reaches the `reg-fixed-voltage` driver, and the idle gate waits
|
||||
out the transient `running` a forgectrl restart passes through. The
|
||||
debug image and the drill scripts were staged in `/tmp` and removed.
|
||||
|
||||
## Superseded status notes
|
||||
|
||||
### Shared machine services — remaining polish, as listed 2026-08-13
|
||||
@@ -6681,6 +6708,20 @@ was dropped by operator decision. Items 4 and up move down one.
|
||||
injected: flood the head's bus from userspace while the driver talks, one
|
||||
bench slot.
|
||||
|
||||
### Debug-kernel checks (item 3), closed 2026-08-31
|
||||
|
||||
Closed: both drills passed on the debug-kernel image (the entry above);
|
||||
the variant and the drill tool are in the tree. Items 4 and up move
|
||||
down one.
|
||||
|
||||
3. **Debug-kernel checks.** Run the module load/unload and forced
|
||||
`-EPROBE_DEFER` drills (`scripts/bench/debug_kernel_drills.py`) on the
|
||||
debug-kernel image (`kas/forgefirm-glowforge-debug.yml`, built beside the
|
||||
closing image). Both cycle the 40 V rail: a module unload powers it off (a
|
||||
stepper driver can come out of the power-up unserviceable), and the forced
|
||||
defer needs the 40 V regulator unbound under the probe. It is a bench slot
|
||||
with the rail-cycle gamble accepted, and it rides the closing burn.
|
||||
|
||||
## Reference notes
|
||||
|
||||
### Head-IRQ source validation — the beam-emission hypothesis
|
||||
|
||||