Retire next-work item 3: the debug-kernel drills passed
Load/unload under DEBUG_MUTEXES (three clean cycles) and the forced -EPROBE_DEFER unwind both passed on the debug-kernel image, no lock splat, machine recovered (CAMPAIGN-LOG has the run). BRINGUP: the item closes, items 4 and up move down one.
This commit is contained in:
+15
-22
@@ -355,7 +355,7 @@ factory 2.6.0-2228 session; measured numbers in the facts bank).
|
||||
alike: the retrace is sized to `cnc/max_backtrack` and the lead follows it,
|
||||
so a pause with little history behind it shortens both rather than failing.
|
||||
GRBL mode uses feed hold / cycle start, so a resumed GRBL cut picks up where
|
||||
the deceleration ended (item 8). A pause is not a cancel: the latch
|
||||
the deceleration ended (item 7). A pause is not a cancel: the latch
|
||||
stays unlocked and the window open across it. There is no resume dwell: the
|
||||
safing chain re-arms ~216 ms before the first step (facts bank).
|
||||
- **`lid_policy = hold`** selects stock grblHAL door behavior instead (park in
|
||||
@@ -1115,14 +1115,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
reachable-mode reasoning and the factory fallback configuration are in
|
||||
the headers of kernel patches 0011-0013 (`meta-glowforge-bsp`,
|
||||
`recipes-kernel/linux/`).
|
||||
3. **Debug-kernel checks.** Run the module load/unload and forced
|
||||
`-EPROBE_DEFER` drills (`scripts/bench/debug_kernel_drills.py`) on the
|
||||
debug-kernel image (`kas/forgefirm-glowforge-debug.yml`, built beside the
|
||||
closing image). Both cycle the 40 V rail: a module unload powers it off (a
|
||||
stepper driver can come out of the power-up unserviceable), and the forced
|
||||
defer needs the 40 V regulator unbound under the probe. It is a bench slot
|
||||
with the rail-cycle gamble accepted, and it rides the closing burn.
|
||||
4. **Release acceptance follow-through.** The campaign is the release gate
|
||||
3. **Release acceptance follow-through.** The campaign is the release gate
|
||||
and runs as designed: dev image `20260824230512`, 45 of 45 from nothing,
|
||||
36 of them unattended with the bench actuator in the loop, release
|
||||
authorized (the export is on the board at `/data/forgetest/export/`).
|
||||
@@ -1138,16 +1131,16 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
stay host-side by design, and the registry marks them so. The deferred
|
||||
emulator homing-image smoke is tool work here too, now that the
|
||||
emulator can be pointed at live snapshots. The first
|
||||
release is item 5.
|
||||
5. **Publish.** The first release: `releases/v<version>/acceptance.json`
|
||||
release is item 4.
|
||||
4. **Publish.** The first release: `releases/v<version>/acceptance.json`
|
||||
from the authorized export, `scripts/release.sh`, the kas flip and the
|
||||
first GitHub release, per the site (Developers, "Release flow"), once
|
||||
ready to publish. Repoint the core submodule to
|
||||
upstream if the `step_us_min` sizing fix merges.
|
||||
6. **Update system Phase 5 — recovery refresh.** The remaining phase of
|
||||
5. **Update system Phase 5 — recovery refresh.** The remaining phase of
|
||||
`docs/UPDATE-SYSTEM.md` (a refreshed recovery image in boot0); Phases 0–4
|
||||
are done.
|
||||
7. **Head-IRQ source validation — beam-emission hypothesis (exploratory, not
|
||||
6. **Head-IRQ source validation — beam-emission hypothesis (exploratory, not
|
||||
gating).** The EV_SW `head` bit (GPIO3_22, factory pad HEAD_IRQ) is the head
|
||||
MCU's attention line — idle LOW with a healthy head, pulsing on head reboot,
|
||||
floating to the SoC pull-up with no head — so the raw level is not a
|
||||
@@ -1163,7 +1156,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
log EV_SW head-bit edges plus `head/beam_detect_digital|_analog` while
|
||||
firing.
|
||||
|
||||
8. **Gapless pause and resume in GRBL mode (planned).** A pause leaves a mark
|
||||
7. **Gapless pause and resume in GRBL mode (planned).** A pause leaves a mark
|
||||
in the cut. With laser mode on, the core stops the beam at the start of the
|
||||
hold (`disable_laser_during_hold`, on by default), so the head travels the
|
||||
whole deceleration dark, and the resume re-accelerates from a standstill at
|
||||
@@ -1197,7 +1190,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
line does to it, and how it composes with the armed window's disarm grace
|
||||
across a long hold.
|
||||
|
||||
9. **Head crash and rail-contact detector (planned).** The head
|
||||
8. **Head crash and rail-contact detector (planned).** The head
|
||||
accelerometer is the motion-liveness probe and nothing more; the
|
||||
factory runs two tiers off the same sensor (a per-axis alert that
|
||||
pauses, a per-axis abort), and its thresholds arrive in every pulse
|
||||
@@ -1209,7 +1202,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
are established. A pause on contact, on the factory's shape, would be
|
||||
the first use.
|
||||
|
||||
10. **A sender change while a job runs: discussion.** Today a sender that
|
||||
9. **A sender change while a job runs: discussion.** Today a sender that
|
||||
disconnects mid-job leaves the motion running to the end of what the
|
||||
controller holds, with the window closed and fire suppressed (the
|
||||
consent belonged to the displaced session), so the job finishes dark
|
||||
@@ -1226,9 +1219,9 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
a hold parks the head over hot material with the assist air on the run
|
||||
profile, and the grace then closes the window in Hold as it does today;
|
||||
running on leaves a clean stop position but wastes the piece. Decide
|
||||
with the gapless pause and resume item (8), which owns the resume
|
||||
with the gapless pause and resume item (7), which owns the resume
|
||||
mechanics.
|
||||
11. **The flow check while the tube is lit.** The arm-time heater check
|
||||
10. **The flow check while the tube is lit.** The arm-time heater check
|
||||
starts at the session open, so with a prompt press the tube is lit
|
||||
for most of its window, and a lit CW window adds about 1.5 C to the
|
||||
rise (0.5 C at 45 % density) against a 1.6 C margin; on top of that the
|
||||
@@ -1261,7 +1254,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
remains; a scope on the two sensor lines during a cut is the next
|
||||
instrument. It sits inside the ceiling's 2 C hysteresis and the flow
|
||||
check reads means, so it is a measurement item, not a gate item.
|
||||
12. **Laser power-good: what the line means.** `cnc/laser_pgood` and its
|
||||
11. **Laser power-good: what the line means.** `cnc/laser_pgood` and its
|
||||
sampled count are defined in the UAPI (active low, one sample every
|
||||
~3.9 ms), the facts bank records that the sampled count reads 0 through
|
||||
real cutting, and the cooling engine warns
|
||||
@@ -1273,7 +1266,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
scope against `hv_current` through an armed cut, its meaning written
|
||||
into the facts bank and the UAPI, and then either a warning that means
|
||||
something or no warning.
|
||||
13. **Initial commissioning: measure and set the machine's own numbers
|
||||
12. **Initial commissioning: measure and set the machine's own numbers
|
||||
methodically.** Every tunable that was measured on the bench machine
|
||||
and shipped as a default varies from machine to machine: the flow
|
||||
check's bands and `cool_flow_rise`, the tube's heat coefficients
|
||||
@@ -1309,8 +1302,8 @@ covers the warm-up hold), the supply temperature window (the service sends
|
||||
the whole ADC range and the factory binds it to nothing; the supply is
|
||||
watched per job instead), the head, lid, interconnect and fused temperature
|
||||
ceilings (no sensor at those locations; the chassis is watched per job), the
|
||||
head accelerometer thresholds (item 9), the lid IR thresholds (the fire
|
||||
head accelerometer thresholds (item 8), the lid IR thresholds (the fire
|
||||
watch runs on local knobs; the header values stay ignored), the
|
||||
HV current caps (the sampled emission witness covers the idle case, and HV
|
||||
current is ranged per job), the thermal report upload conditions and the
|
||||
pump flag. Beam detect stays with item 7.
|
||||
pump flag. Beam detect stays with item 6.
|
||||
|
||||
@@ -4979,6 +4979,33 @@ userspace i2c-dev serialize under the adapter lock, so flooding the bus
|
||||
does not collide on the wire - the head reset is the reachable way to
|
||||
make a present head answer badly.
|
||||
|
||||
## 2026-08-31: the debug-kernel drills, on the lock-debugging image
|
||||
|
||||
Both drills passed on the debug-kernel image
|
||||
(forgefirm-image-dev-debug-glowforge.rootfs-20260831203241, kernel
|
||||
`DEBUG_MUTEXES=y PROVE_LOCKING=y LOCKDEP=y DEBUG_ATOMIC_SLEEP=y
|
||||
DEBUG_SPINLOCK=y`, verified in /proc/config.gz).
|
||||
|
||||
**Load/unload.** forgectrl stopped, `glowforge.ko` unloaded and reloaded
|
||||
three times with a rail-settle between; each cycle clean, and the kernel
|
||||
log over the three carried no lock splat.
|
||||
|
||||
**Forced `-EPROBE_DEFER`.** The cnc device unbound, its 40 V regulator
|
||||
(`regulators:40v` on `reg-fixed-voltage`) unbound, then cnc re-bound:
|
||||
the probe deferred (cnc did not bind while the regulator was gone) and
|
||||
its devm unwind left the log free of splats; restoring the regulator
|
||||
let the deferred probe complete and cnc bind again.
|
||||
|
||||
The machine ended healthy: cnc idle, the GRBL controller running with
|
||||
motion verified, the head present, and no BUG/WARNING/lockdep splat
|
||||
anywhere after the first drill mark. Both drills cycle the 40 V rail (5
|
||||
`40V on` events across the session) and the drivers came back each time.
|
||||
Three bench facts hardened the drill in the running (forgefirm 2319735):
|
||||
the splat filter ignores the benign lockdep boot banner, the regulator
|
||||
search reaches the `reg-fixed-voltage` driver, and the idle gate waits
|
||||
out the transient `running` a forgectrl restart passes through. The
|
||||
debug image and the drill scripts were staged in `/tmp` and removed.
|
||||
|
||||
## Superseded status notes
|
||||
|
||||
### Shared machine services — remaining polish, as listed 2026-08-13
|
||||
@@ -6681,6 +6708,20 @@ was dropped by operator decision. Items 4 and up move down one.
|
||||
injected: flood the head's bus from userspace while the driver talks, one
|
||||
bench slot.
|
||||
|
||||
### Debug-kernel checks (item 3), closed 2026-08-31
|
||||
|
||||
Closed: both drills passed on the debug-kernel image (the entry above);
|
||||
the variant and the drill tool are in the tree. Items 4 and up move
|
||||
down one.
|
||||
|
||||
3. **Debug-kernel checks.** Run the module load/unload and forced
|
||||
`-EPROBE_DEFER` drills (`scripts/bench/debug_kernel_drills.py`) on the
|
||||
debug-kernel image (`kas/forgefirm-glowforge-debug.yml`, built beside the
|
||||
closing image). Both cycle the 40 V rail: a module unload powers it off (a
|
||||
stepper driver can come out of the power-up unserviceable), and the forced
|
||||
defer needs the 40 V regulator unbound under the probe. It is a bench slot
|
||||
with the rail-cycle gamble accepted, and it rides the closing burn.
|
||||
|
||||
## Reference notes
|
||||
|
||||
### Head-IRQ source validation — the beam-emission hypothesis
|
||||
|
||||
Reference in New Issue
Block a user