BRINGUP: first GRBL-mode burn landed 2026-08-11
This commit is contained in:
+11
-9
@@ -646,7 +646,9 @@ accordingly ("Automatic — AP country, else World").
|
|||||||
the contract. **No live fire before the standing scope gates.** Gate
|
the contract. **No live fire before the standing scope gates.** Gate
|
||||||
status:
|
status:
|
||||||
- **GRBL-MODE LASER SOFTWARE: IMPLEMENTED 2026-08-09, bench-verified
|
- **GRBL-MODE LASER SOFTWARE: IMPLEMENTED 2026-08-09, bench-verified
|
||||||
without fire. FIRST LIGHT PENDING (operator-run, chain armed).**
|
without fire. FIRST LIGHT LANDED 2026-08-11 — first GRBL-mode burn
|
||||||
|
completed (operator-run LightBurn job, chain armed, motor-rail
|
||||||
|
settle in place).**
|
||||||
- Architecture: the real spindle lives in
|
- Architecture: the real spindle lives in
|
||||||
`grblHAL-glowforge/src/glowforge_laser.c`; per-segment spindle
|
`grblHAL-glowforge/src/glowforge_laser.c`; per-segment spindle
|
||||||
updates (the core's laser-mode path, running on the stepper
|
updates (the core's laser-mode path, running on the stepper
|
||||||
@@ -714,14 +716,14 @@ accordingly ("Automatic — AP country, else World").
|
|||||||
run fans with every M8. Note for senders: a disconnecting
|
run fans with every M8. Note for senders: a disconnecting
|
||||||
sender leaves a pending arm wait until the button timeout
|
sender leaves a pending arm wait until the button timeout
|
||||||
clears it (latch relocks then).
|
clears it (latch relocks then).
|
||||||
- **Remaining for first light** (operator present, coolant
|
- **Remaining commissioning items** (first light itself landed
|
||||||
flowing, never autonomous): the chain-armed procedure itself;
|
2026-08-11; operator present, coolant flowing, never
|
||||||
verify the hardware button latch persists across kernel-run
|
autonomous): verify the hardware button latch persists across
|
||||||
gaps mid-job (if OK_2_FIRE drops between motion bursts, the
|
kernel-run gaps mid-job (if OK_2_FIRE drops between motion
|
||||||
fix is a stream keepalive across armed gaps); interlock-trip
|
bursts, the fix is a stream keepalive across armed gaps);
|
||||||
recovery; warm-baseline flow-check behavior under real laser
|
interlock-trip recovery; warm-baseline flow-check behavior
|
||||||
heating; then the planned low-temperature gates and TEC
|
under real laser heating; then the planned low-temperature
|
||||||
handling below.
|
gates and TEC handling below.
|
||||||
- **2026-08-11: the failed first-light attempts' no-motion root
|
- **2026-08-11: the failed first-light attempts' no-motion root
|
||||||
cause — fast 40 V motor-rail bounces — found and mitigated.**
|
cause — fast 40 V motor-rail bounces — found and mitigated.**
|
||||||
An off→on bounce of the 40 V rail within ~tens to hundreds of
|
An off→on bounce of the 40 V rail within ~tens to hundreds of
|
||||||
|
|||||||