BRINGUP: first GRBL-mode burn landed 2026-08-11
This commit is contained in:
+11
-9
@@ -646,7 +646,9 @@ accordingly ("Automatic — AP country, else World").
|
||||
the contract. **No live fire before the standing scope gates.** Gate
|
||||
status:
|
||||
- **GRBL-MODE LASER SOFTWARE: IMPLEMENTED 2026-08-09, bench-verified
|
||||
without fire. FIRST LIGHT PENDING (operator-run, chain armed).**
|
||||
without fire. FIRST LIGHT LANDED 2026-08-11 — first GRBL-mode burn
|
||||
completed (operator-run LightBurn job, chain armed, motor-rail
|
||||
settle in place).**
|
||||
- Architecture: the real spindle lives in
|
||||
`grblHAL-glowforge/src/glowforge_laser.c`; per-segment spindle
|
||||
updates (the core's laser-mode path, running on the stepper
|
||||
@@ -714,14 +716,14 @@ accordingly ("Automatic — AP country, else World").
|
||||
run fans with every M8. Note for senders: a disconnecting
|
||||
sender leaves a pending arm wait until the button timeout
|
||||
clears it (latch relocks then).
|
||||
- **Remaining for first light** (operator present, coolant
|
||||
flowing, never autonomous): the chain-armed procedure itself;
|
||||
verify the hardware button latch persists across kernel-run
|
||||
gaps mid-job (if OK_2_FIRE drops between motion bursts, the
|
||||
fix is a stream keepalive across armed gaps); interlock-trip
|
||||
recovery; warm-baseline flow-check behavior under real laser
|
||||
heating; then the planned low-temperature gates and TEC
|
||||
handling below.
|
||||
- **Remaining commissioning items** (first light itself landed
|
||||
2026-08-11; operator present, coolant flowing, never
|
||||
autonomous): verify the hardware button latch persists across
|
||||
kernel-run gaps mid-job (if OK_2_FIRE drops between motion
|
||||
bursts, the fix is a stream keepalive across armed gaps);
|
||||
interlock-trip recovery; warm-baseline flow-check behavior
|
||||
under real laser heating; then the planned low-temperature
|
||||
gates and TEC handling below.
|
||||
- **2026-08-11: the failed first-light attempts' no-motion root
|
||||
cause — fast 40 V motor-rail bounces — found and mitigated.**
|
||||
An off→on bounce of the 40 V rail within ~tens to hundreds of
|
||||
|
||||