mirror of
https://github.com/openglow-org/forgefirm.git
synced 2026-09-27 08:41:13 -07:00
The stream harness keeps the analog rendering as the host-test conservatism reference (rule 13's mask, the duty ladders) and drops the M101 switch sessions; rule 18 stays as the derived-floor proof, now satisfied from boot by the precompute. The lifecycle harness's state-files scenario asserts the derived floor is in $$ before any arm. The catalog's laser.power-model-switch goes and laser.power-floor reads the one floor key with no M-code needed. The mswitch drill goes; the m4corner drill becomes a single density pass; the dpatch drill returns to density only. The CAMPAIGN-LOG records the first rasters (254 and 508 DPI grayscale wedges: tonality held to ~14 pulse slots per pixel, no dither artifact, one benign stale-verdict suppression under CPU starvation) and the decision that ends the analog mode - the strike transient fires a spot at every beam-on, and the finish comparison found no advantage. BRINGUP, LIGHTBURN, MOTION and SAFETY describe the density-only present.