Files
forgefirm/docs
ScottW514 61b68c387c Add cooling.flow-under-load: the flow check with the tube lit through its window
A live catalog case: two 30 x 4 mm fills at full power on the press, the
window held open until the engine's flow verdict lands in the forgectrl
log, then M2 and the head brought back. PASS needs a verified line with
the laser's share on it (at least 0.3 C: the window and the fire
overlapped) and the judged rise at least 1 C under cool_flow_rise; an arm
refused by a gate names the gate. Passed on image 20260829190323
(heater rise 11.9 C judged, laser 0.6 off 12.5).

CAMPAIGN-LOG records the run and the day's two air-assist gate holds (a
bench connection, reseated); BRINGUP item 21 names the case.

Catalog: the case covers forgectrl src/cool.* and its neighbors; a new
test, so the manifest's coverage widens rather than moves.
2026-08-29 16:39:03 -04:00
..
2026-08-19 21:21:30 -04:00