Files
forgefirm/scripts
ScottW514 3025996c86 Prove the M101 dose-model switch; record the judged dose curves
The stream harness gains rules 18 to 21: the floor is derived from the
selected model's config key at the arm and a typed $35 is overwritten;
M101 switches the rendering exactly at the boundary in both directions
with no continuous FIRE at full duty across it; a refused switch (the
spindle on) leaves the stream unchanged, and the harness resyncs with
an empty line because the core skips G-code after an error until the
sender resyncs; M2 reverts a program-scoped switch and Q1 holds. The
analog sessions pin laser_floor_analog at the density floor so the
existing duty expectations stand, and the density ladder's unfloored
run moves from a chained $35 write to the laser_floor_density key.

The catalog's laser.power-floor becomes model-aware: it reads the
configured model and the floor keys from forgectrl, switches to the
configured model with M101 so the derivation runs without a fire, and
expects $35 to be that model's floor. The new laser.power-model-switch
switches to each model with the spindle off, checks the reported
message and $35 after each switch, and checks the M2 revert. The new
mswitch bench drill runs the switch on the machine in one armed run.

Docs follow: BRINGUP's Laser control section describes the switch, the
derived floors and the measured dose response of both models; the
MOTION settings table gains the five keys; LIGHTBURN gains a Power
models section and drops the stale 30 percent floor advice; SAFETY
names the switch's refusal rule; the CAMPAIGN-LOG records the judged
depth-witness runs of 2026-08-30 and the switch's host and bench proof.
2026-08-30 15:08:34 -04:00
..