Commit Graph
3 Commits
Author SHA1 Message Date
ScottW514 ff117c4f6b bench: reach the board through a configurable ssh client; document every tool
The host-side coolant and fan tools call the ssh on PATH, or the client
named by GF_SSH (a wrapper such as a WSL distro's ssh), instead of a
fixed wrapper. The bench README lists every committed tool and data
file, and explains how the coolant-flow fire-gate threshold was
derived from the committed flow-matrix data and how to re-run that
derivation on another machine.
2026-08-15 06:12:39 -04:00
ScottW514 cc927aca5f Add laser-safety and regulatory documentation; scrub bench identity
- LIGHTBURN.md: mandatory "Before you cut" safety section; the
  walkthrough now reflects the firing machine (dry runs need the
  layer output off or M5; live first-cut instructions); the homing
  entry documents homing_mode and the gfcloud method; the machine
  address is a placeholder.
- README.md: condensed safety section linking the full text and the
  regulatory notes.
- INSTALL.md: "Regulatory and legal" section ahead of the install
  steps; routine updates route through the panel updater rather than
  the installer.
- BRINGUP.md: the release signing key is described as held offline
  (no on-disk path); bench address and credential notes removed;
  Next-work item 7 corrected (the installer embeds the production
  release key); status entry for audit remediation Phases 0-1; the
  GATE A kernel drills join the pending image-flash checklist.
- bench scripts: the target host comes from GF_HOST (or argv) instead
  of a hardcoded address.
- laser_stream_test.py: per-session controller runs with a hermetic
  cooling-verdict publisher; new assertions that every stream
  terminates with FIRE clear (including M3 held to stream end) and
  that no FIRE bit rides a zero-step gap; a cycle-churn session
  exercises the stop/start seams.

Audit findings D-1, D-2, D-3, D-5, D-10, D-12, B-10, and the harness
half of D-4/G-1.
2026-08-14 15:38:24 -04:00
ScottW514 f92147093e Flow-detection experimental record and bench tooling
Adds the design matrix and its supporting tools, and records in BRINGUP
what the 60-run matrix overturned: sub-40-percent duty mimics flow
(three of five dead-pump trials looked healthier than a working pump),
the operating point and threshold now rest on 25 pooled observations,
periodic re-checks are thermally free with the fans running, and the
settle gate closes a bench-proven miss. Also records what is NOT yet
validated - warm-loop baselines and behaviour under laser heating - as
first-light commissioning items.
2026-08-02 23:51:31 -04:00