Commit Graph
4 Commits
Author SHA1 Message Date
ScottW514 3c095ccbd1 laser milestone: grblhal SRCREV -> 09bc882, host stream test, docs
BRINGUP item 2: grbl-mode laser software implemented + bench-verified
without fire (record in the gate list); first light pending.
LIGHTBURN.md: arming/button-press operation, S-max 1000, fire gates.
scripts/bench/laser_stream_test.py: host-side stream-dump contract
verification against the null-sink build.
2026-08-09 16:13:03 -04:00
ScottW514 f396dbde34 Remove history narrative and audit references from docs and tooling
temp_calibrate now cross-checks the factory B-equation instead of the retired linear guess.
2026-08-03 11:54:27 -04:00
ScottW514 6f53e628f3 Fan/thermal control done and bench-verified; docs updated
BRINGUP records the gate as complete with tach-verified results;
LIGHTBURN.md documents the per-layer Air Assist toggle driving the
cut-profile ventilation; fan_test.py joins the bench kit.
2026-08-02 17:31:53 -04:00
ScottW514 c08f1ad7e3 docs: LightBurn setup and operating guide (motion-only stage) 2026-08-02 14:53:22 -04:00