Commit Graph
2 Commits
Author SHA1 Message Date
ScottW514 0eb764bf75 Added SPDX 2026-09-18 12:14:22 -04:00
ScottW514 1fef9c6f51 forgetest: the air-assist offset calibration runs before the heater tools
A queue runs the catalog in registration order among tests with the
same prerequisites, and cooling.aa-offset-calibrate followed
cooling.flow-verify. A flow-verify trial heats the tube water (a no-flow
trial by 17 C on the bench) and the warm slug circulates past the
coolant sensors for minutes afterward; the calibration's stationary gate
passed 44 s after the trial on image 20260902144848 and the edges read
the wave as disagreement.

The calibration is registered first now, with the reason beside it, and
tests/test_cooling_order.py holds the order.

Catalog consequence: the cooling.* implementation hashes move (the suite
file changed).
2026-09-02 16:21:13 -04:00