mirror of
https://github.com/openglow-org/forgefirm.git
synced 2026-09-28 01:01:12 -07:00
BRINGUP: coolant flow verification done - heater trick characterized and live-verified
This commit is contained in:
+9
-2
@@ -232,8 +232,15 @@ hardware I/O — host testing).
|
|||||||
it to a hard fire gate). Verified via tach readbacks: air tach
|
it to a hard fire gate). Verified via tach readbacks: air tach
|
||||||
period 4439→699 under M8, exhaust stopped→full, intakes ~3×,
|
period 4439→699 under M8, exhaust stopped→full, intakes ~3×,
|
||||||
cooldown hold, clean return to idle; coolant temp visibly
|
cooldown hold, clean return to idle; coolant temp visibly
|
||||||
dropped during the blast. TEC/heater control remain for the
|
dropped during the blast. **Coolant flow verification also DONE**
|
||||||
thermal part of the laser milestone.
|
(the factory heater trick: loop heater at 10 % between the two
|
||||||
|
water-temp sensors; measured on this machine — flow ΔT settles
|
||||||
|
+2.5..4.0 °C and never sustains >4.1, pump-stopped ΔT hits
|
||||||
|
+4.6..5.7 within 20 s; fault = ΔT>4.5 °C for 20 s, live-verified:
|
||||||
|
pump stopped → sender warning in 40 s → recovery re-arms).
|
||||||
|
Absolute ceiling 33 °C (job-header CMrx; heater adds ~1.5 °C to
|
||||||
|
the loop). TEC control remains for the thermal part of the laser
|
||||||
|
milestone; both warnings become hard fire gates there.
|
||||||
- **Interlock readback semantics cross-check: OPEN** (see
|
- **Interlock readback semantics cross-check: OPEN** (see
|
||||||
factory-laser-safety-readbacks notes).
|
factory-laser-safety-readbacks notes).
|
||||||
3. **Homing (design decided 2026-08-02)**: the factory machine has NO
|
3. **Homing (design decided 2026-08-02)**: the factory machine has NO
|
||||||
|
|||||||