Record live-fire drill results: emission witness, HV, lid-IR, X-3, G-10
Phase 5 A-1 emission witness and A-5 HV telemetry pass on live burns; A-2 lid-IR characterized as a weak signal at 40% (gate left watch-only); pgood confirmed unusable as a witness on this PSU. Phase 4 X-3 (0.1s job-based disarm on M2) and G-10 (disarm counts down in Hold) pass. Adds live_fire_drills.py (arm-lifecycle sampler over TCP + HTTP).
This commit is contained in:
+73
-7
@@ -112,13 +112,79 @@ MOTION and re-probed rather than false-passed, and the second probe
|
||||
returned MOTION OK (p2p x=3919, y=1636) — the DRV8825s are not wedged
|
||||
after the drill session's rail cycles.
|
||||
|
||||
**Still pending — operator-present:** the connection-flood
|
||||
`machine_is_idle` fail-closed check under motion (X-2); the stale-gate
|
||||
/ motion-integrity armed drills across Phases 4 and 6 (physical
|
||||
button); and the Phase 5 live-fire work — emission-witness live check
|
||||
and lid-IR fire characterization to set `cool_fire_ir_delta` from the
|
||||
ambient baseline below. Live fire only with the operator armed: eye
|
||||
protection, fire watch, exhaust running.
|
||||
**X-2 connection-flood robustness exercised (dry):** a 500-connection
|
||||
slow-drip flood from a second LAN host drove forgectrl from 7 to a peak
|
||||
of 379 open fds, where it plateaued — MHD's own connection handling
|
||||
caps concurrency far below the raised 4096 `RLIMIT_NOFILE`, so the
|
||||
flood could not manufacture the EMFILE that the X-2 fix guards against.
|
||||
The daemon never crashed, the kernel `cnc/state` stayed readable
|
||||
throughout (two local `/status` probes timed out at the peak and
|
||||
recovered within a second), and it returned to 7 fds with `/status`
|
||||
`200` after the flood drained. The fail-closed branch itself
|
||||
(`machine_is_idle()` returns busy on any `rd_attr` failure) is present
|
||||
in `status.c` and covered by the `-Werror` CI build; distinctly
|
||||
exercising the EMFILE→busy path wants a host unit test that injects the
|
||||
read failure (the clean X-2 closure — the runtime flood cannot reach it
|
||||
while MHD caps connections below the fd limit). Note for F-15/X-6: the
|
||||
absence of an explicit `MHD_OPTION_CONNECTION_LIMIT` + per-IP cap is
|
||||
still the deferred half; the default ceiling held here but a per-IP cap
|
||||
remains the right hardening.
|
||||
|
||||
**Live-fire drills PASS (operator armed, S400/40% vector marks on
|
||||
scrap, `scripts/bench/live_fire_drills.py`):**
|
||||
|
||||
- **Phase 5 A-1 emission witness — PASS.** On a commanded fire window
|
||||
`cnc/laser_on_sampled` (surfaced as `/status` `laser.emission_samples`)
|
||||
goes to its full 255 count and returns to 0 at Idle, across two
|
||||
separate burns. This is the reliable live-emission witness.
|
||||
- **Phase 5 A-5 HV telemetry — PASS.** `pic/hv_current` (`hv_current_raw`)
|
||||
tracks the cut: 0 at idle, 0→1023/661/482 raw during the three burns
|
||||
(the tube draws real current). The only HV witness on this PSU —
|
||||
`hv_voltage` is grounded, as the audit noted.
|
||||
- **Phase 5 A-2 lid IR — characterized, gate left watch-only.** A 40 %
|
||||
vector cut lifts the four `pic/lid_ir` channels only ~+3 counts over
|
||||
the ambient baseline (37/36/40/40 → peaks ~40/39/42/43) — barely above
|
||||
the ±3-count ambient noise, i.e. a weak fire signal at this power.
|
||||
`cool_fire_ir_delta` therefore stays 0 (watch-only) until a
|
||||
representative high-power job is characterized; a real ignition flare
|
||||
is far brighter than a cut, so the eventual threshold sits well above
|
||||
both the cut delta and the noise (a floor near 15 counts is the
|
||||
working target, not yet committed). forgectrl's per-job telemetry line
|
||||
logs baseline/peak for all four channels.
|
||||
- **pgood is not a usable witness on this PSU.** `cnc/laser_pgood_sampled`
|
||||
stayed 0 (forgectrl reads <128 as "not good") through every burn even
|
||||
while `hv_current` rail'd and the tube cut — so A-1's "surface
|
||||
laser_pgood loss" warning is a false alarm on this hardware and must
|
||||
be gated/suppressed here (or documented as expected); the emission and
|
||||
HV witnesses are the trustworthy ones. Recorded for the A-1 follow-up.
|
||||
- **Phase 4 X-3 job-based disarm — PASS.** A job ending in `M2`
|
||||
(program end, as LightBurn sends) disarms in **0.1 s** at Idle; a job
|
||||
with no program end falls back to the ~60 s `laser_disarm_s` idle
|
||||
grace (measured 56.8 s). The window is job-based, not 60-s-idle-based.
|
||||
- **Phase 4 G-10 disarm-in-Hold — PASS.** Armed, fired a +X move,
|
||||
feed-held mid-move (`Hold:1`); the disarm grace counts down while held
|
||||
and closes the window at 61.3 s (the bug left a job abandoned in Hold
|
||||
armed for hours).
|
||||
|
||||
**Live defect caught and fixed by the campaign:** the liveness probe's
|
||||
enclosure guard read the combined-doors EV_SW bit with inverted sense
|
||||
(bit 3 set = *closed*, per the switch map; the guard treated set as
|
||||
*open*), so the wedge probe skipped on every spawn with the lid closed
|
||||
and would have moved the gantry with it open. Fixed in forgectrl
|
||||
`424f185`, hot-deployed; the probe then ran for real and behaved as
|
||||
designed — a gray-zone first read (head-accel p2p x=455, below the ≥500
|
||||
threshold) was retried rather than false-passed, and the retry returned
|
||||
MOTION OK (p2p x=3919, y=1636).
|
||||
|
||||
**Deferred (fiddly or config-dependent, not blocking):** G-4 (arm
|
||||
re-checks the coolant fire gate after the button wait) wants the pump
|
||||
killed in the instant after the press — cleanest as a host unit test;
|
||||
the code re-check is in place. Phase 6's "armed job refuses at the stale
|
||||
origin after an underrun" is config-dependent (GRBL mode permits
|
||||
unhomed cutting), and the core underrun behavior — `pulse data
|
||||
underrun; position no longer trusted` with the homing anchor unlinked —
|
||||
is already logged in the dry dead-man drills above. Live fire only with
|
||||
the operator armed: eye protection, fire watch, exhaust running.
|
||||
|
||||
The lid-IR **ambient baseline** for the fire-watch characterization is
|
||||
captured on this image (600 samples over 5.6 min at 2 Hz, lid closed,
|
||||
|
||||
Reference in New Issue