docs: the shakedown on 20260903163543, and the arm fix under live fire

The whole catalog ran green, 56 of 56, but on a hot-deployed suite file,
so it authorizes nothing; the entry says so first. What it did was find
the one real defect, the pic-soc-load bound that decided on a count of
noise, and put the arm-acknowledgment fix under live fire: the emission
witness passed with its airflow witness finding nothing, on the same
instant button press that produced last night's burn.

Also recorded: the boot clock that never stepped, and the bench fixture
dropping off the network mid-queue with no address pinned to fall back
to.
This commit is contained in:
ScottW514
2026-09-03 15:16:24 -04:00
parent 7968ebd347
commit da0c70703d
+65
View File
@@ -7722,6 +7722,71 @@ there were no QA warnings. This image supersedes 20260903011655 as the
campaign's image, and the campaign must start again on it: three layer hashes
moved, so nothing is inherited.
## 2026-09-03: the shakedown on image 20260903163543, and the arm fix under fire
The image went on the bench and the whole catalog ran. It does not authorize
that image, and it was never meant to: one suite file was hot-deployed part
way through, so the catalog on the machine is not the catalog in the image.
This pass was for finding defects, and the clean run on a rebuilt image is
the one that counts.
Two things had to be cleared before any of it. The board came up with its
clock at March 2018 and the time daemon never stepped it, twenty-one minutes
in, with the large-step flag set and name resolution working. Every campaign
identifier and result would have carried that date, so the clock was set from
the workstation and written to the hardware clock, and the daemon disciplined
from there. Nothing in this image touches time keeping and the same pattern
appears on earlier boots, so this is not new, but it is worth a look on the
next cold boot. The fresh-boot reference itself was clean: eighty attributes,
no disagreement with the fixed values.
The unattended set then stopped at its seventh test on `kernel.pic-soc-load`.
The machine was not at fault. Over eleven runs the settle collapsed the load
dependence from a control split of six or seven counts to one, every time,
which is the drill's primary assertion and it never failed. What failed was
the third assertion, which asked the settled reader to move off the idle
regime by at least half the control split. The move is three counts against a
split of six, so the bound sat exactly on the median and decided on one count
of noise: two of the eleven runs failed while the machine read identically to
the nine that passed. The kernel's spin is a couple of counts lighter than a
Python spin, so a settled reader lands above the idle regime without reaching
the busy one, and asking it to reach halfway asked for something the mechanism
does not promise. The bound is now a third of the split, which still catches
the failure it guards, a settle that overshoots and lets the conversion fall
back to idle and so does not move at all, with a count of margin either way.
That file was hot-deployed and the set re-run: thirty-one of thirty-one.
Then the attended ten, with the fix under live fire. `laser.emission-witness`
passed, and the evidence that matters is that its new airflow witness found
nothing: not one sample showed emission while the cooling engine was in a
phase that runs the fans at idle duty. The fixture pressed 0.3 s after the
button lit, the same instant press that produced last night's burn, and this
time the arm waited for the engine to take the job before the window opened.
Against last night's aborted run on the same test, emission peaked at 154
rather than 42 and the high-voltage current reached full scale rather than
236, because the job ran its whole square instead of a second of it. The
operator confirmed the mark on all four sides. The button latch never read set
while the laser latch was unlocked, the supply dipped across the two second
dwell and came back lit for the third side, and the job disarmed a tenth of a
second after Idle on the program end.
The rest went through without a stop: fifty-six of fifty-six, nothing skipped.
`laser.armed-kill` took the controller down mid-fire twice, with emission at
zero about two seconds after each, the latch relocked and the controller
respawned. `laser.disarm-in-hold` held the window open in feed hold for 60.7 s
and then disarmed on the grace. `cooling.flow-under-load` judged its rise with
the tube lit through the window. The cloud four passed, including the
operator's own judgement that the app's progress advanced as it cut.
The bench fixture dropped off the network in the middle of the attended set,
after the emission witness and before the fourth test, and was not reachable
by address or by name from either the machine or the workstation. Its config
carries no address, only a hostname resolved by a multicast query the fixture
answers itself, so when it stops answering there is no fallback. The operator
covered the presses by hand until a power cycle brought it back, and it
resumed taking the arm press immediately. Pinning its address in the config
would keep a failed name query from hiding it.
## Reference notes
### Head-IRQ source validation — the beam-emission hypothesis