docs: the full campaign passes on image 20260907005922; BRINGUP item 8, the first-run commissioning, is closed

This commit is contained in:
ScottW514
2026-09-06 21:58:30 -04:00
parent 143ef11a60
commit bd624410a2
2 changed files with 88 additions and 53 deletions
+6 -52
View File
@@ -1376,9 +1376,11 @@ feature requests, enhancements) will eventually be tracked as GitHub issues.
the headers of kernel patches 0011-0013 (`meta-glowforge-bsp`,
`recipes-kernel/linux/`).
3. **Release acceptance follow-through.** The campaign is the release gate
and runs as designed: dev image `20260824230512`, 45 of 45 from nothing,
36 of them unattended with the bench actuator in the loop, release
authorized (the export is on the board at `/data/forgetest/export/`).
and runs as designed: dev image `20260907005922`, 81 of 81 (53 run, 28
inherited from the campaign before it on the same pins), 67 of them
unattended with the bench actuator in the loop, release authorized
(the export is on the board at `/data/forgetest/export/` and beside
the images under `images/20260907005922/`).
What is left is small. Two catalog gaps from the tool's own plan,
`cooling.confirm-escalate` and
`cooling.fire-gate-blocks-arm`, are not ported (both need the pump
@@ -1419,55 +1421,7 @@ feature requests, enhancements) will eventually be tracked as GitHub issues.
far): re-measure the two heat coefficients and the machine's
air-assist offset; and if a lit check still trips, the
void-on-emission design with the tube as its own flow tracer.
8. **Initial commissioning: measure and set the machine's own numbers
methodically.** Phase 1 (consent, account, preferences, machine facts,
the cloud decision, the gate, HTTPS on 443, the factory return),
phase 2 (the setup checks: switches, sensors, airflow, motion, cameras,
the coolant offset and the flow calibration as checks, the cloud header
capture, the Commissioning tab, the engine-raised flags), and phase 3
(the sheet: the stroke font and renderer, the daemon's own sender with
the emission witnesses, the placement, the frame, the focus, floor,
dose-curve, corner, and flow-load cards, M102 in the driver) are in
forgectrl and the driver. Phase 1 passes the
first-run walk-through and the commission acceptance set on the bench;
phase 2 passes its six automated checks (`commission.check-*`) and the
cloud header capture; phase 3 passes `commission.sheet`, one live run
over the whole sheet on one piece. Phase 4 (the lifecycle: the
what-changed menu, the record as a download and a printable page and
inside the log bundle, the button LED choreography, the second-browser
mirror) is built in forgectrl with its three unattended cases. The
commissioning acceptance set is 23 cases, three of them attended with
the bench actuator up (the page walk, one Print in the Glowforge app,
and the sheet with one press), and every one has passed on the bench.
The usability pass over the cards (every wait named and counted, the
press prompted when the button lights, the result as a sentence with
the settings written and the numbers under a fold) is bench-proven with
the content-sized layout. All of it waits for its push and pin. Every tunable
that was measured on the bench machine
and shipped as a default varies from machine to machine: the flow
check's bands and `cool_flow_rise`, the tube's heat coefficients
(`cool_laser_heat_cw`, `cool_laser_heat_density`), the air-assist
ground offset on the coolant readings, the laser's striking and lasing
thresholds and the duty floor, the fan floors, the thermistor curve
itself. Owed: one commissioning procedure, run once on a new machine
from the panel or the bench page, that measures each of these in
order with the tube dark wherever it can be, fires only where it
must, and writes the results as that machine's settings with a
record; and a reading of what the cloud sets for the same machine,
taken from cloud cuts (the pulse header carries the factory's
per-machine values), so the commissioning can start from the
factory's own numbers where they exist and note where they differ
from the measured ones. The dose-curve recorder (the panel's one-press
ladder, fit and apply) is the first piece of this tool family and the
template for the rest. Next piece, from the corner work: a
**side-by-side chooser** - the tool cuts the same corner-heavy pattern
at several settings of a knob (the corner rolloff first: a row of
passes at, say, 1.0 / 1.25 / 1.5 / 1.75 / 2.0), labels them, and the
operator picks the best by eye; Apply writes the winner. The rolloff
is the proof case (this bench settled at 1.5 and may go lower, so the
shipped default of 2 is a starting point, not a truth), and the same
shape fits any by-eye tunable the commissioning flow meets.
9. **Idle before the kernel drains.** The driver reports Idle when the
8. **Idle before the kernel drains.** The driver reports Idle when the
stream is produced, up to about 550 ms before the pulse engine finishes
playing it after chained jogs (the fact under "Running the controller").
A sender or a service that stops the controller at Idle loses that tail