Add the sender-change and RX-overrun harness scenarios and the day's records
laser_lifecycle_test.py gains sender-change-mid-job (a laser-on against a window closed while the spindle was on must prompt again) and rx-overrun (a job written past the RX ring is reported, stopped in alarm with the window closed, and a clean job arms after it). The flowload drill's verdict parser accepts the engine's laser-share suffix. BRINGUP: item 20 holds only the owed work; item 21 opens the mid-job sender-change discussion with the Grbl expectation; item 22 is the flow check under a lit tube; item 23 is the power-good line's meaning. CAMPAIGN-LOG records the driver fix and the flow-check reading, both host-proven. No catalog consequence: harness scenarios and documentation; no runtime behavior of the release image changes in this commit.
This commit is contained in:
+58
-7
@@ -1447,13 +1447,64 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
overflowed, and the serial layer drops bytes on a full ring (`serial.c`,
|
||||
the overflow flag is set and never read), so the job's M5 and M2 were
|
||||
lost, the window stayed open until the sender disconnected, and the
|
||||
following job ran unarmed. Fix, in this order: arm on
|
||||
`state.on && !laser_ok` (the consent question does not depend on the
|
||||
previous spindle state); clear the spindle state in `gflaser_disarm`;
|
||||
consume the RX overflow flag (report the error and drop the client, so
|
||||
a sender that ignores flow control cannot leave a half job behind).
|
||||
Each part gets a regression test in the null-sink harness with the fix,
|
||||
and the catalog's `covers` widens to `glowforge_laser.c` and `serial.c`.
|
||||
following job ran unarmed. Owed: the driver fix on an image (the arm
|
||||
decided by the window alone, an RX overrun dropping the overrunning
|
||||
line whole and aborting the job), one bench drill of each scenario,
|
||||
and the catalog's `covers` widened to `glowforge_laser.c` and
|
||||
`serial.c`.
|
||||
21. **A sender change while a job runs: discussion.** Today a sender that
|
||||
disconnects mid-job leaves the motion running to the end of what the
|
||||
controller holds, with the window closed and fire suppressed (the
|
||||
consent belonged to the displaced session), so the job finishes dark
|
||||
and the material is left with an unfinished cut. This is the stock
|
||||
Grbl and grblHAL expectation for the motion: the controller has no
|
||||
notion of sender presence, executes what its planner and RX ring hold,
|
||||
and then waits; the core's stream code (`stream.c`,
|
||||
`stream_disconnect`) only switches streams, with no hold and no
|
||||
alarm, and senders treat a lost connection as a failed job (LightBurn
|
||||
stops its own side and resumes nothing). ForgeFIRM adds only the
|
||||
disarm on top. The open question is whether the disarm should also
|
||||
feed-hold the job, so a reconnecting sender can press and resume where
|
||||
the cut stopped instead of finding the head at the end of a dark pass:
|
||||
a hold parks the head over hot material with the assist air on the run
|
||||
profile, and the grace then closes the window in Hold as it does today;
|
||||
running on leaves a clean stop position but wastes the piece. Decide
|
||||
with the gapless pause and resume item (17), which owns the resume
|
||||
mechanics.
|
||||
22. **The flow check while the tube is lit.** The arm-time heater check
|
||||
starts at the session open, so with a prompt press the tube is lit
|
||||
for most of its window, and a lit CW window adds about 1.5 C to the
|
||||
rise (0.5 C at 45 % density) against a 1.6 C margin; on top of that the
|
||||
engine takes its baseline from one sample while the coolant ADC
|
||||
carries a common-mode offset of about 1 C that steps in when the
|
||||
airflow goes to the run profile, steps out when it returns to idle,
|
||||
and toggles between two levels in between. Together they put an
|
||||
ordinary job's check within a few tenths of the limit. Owed, in order:
|
||||
the engine's reading (means for the baseline and the end, the tube's
|
||||
share taken off from the `hv_current` integral, one coefficient per
|
||||
power model) on an image; three `flowload t1` runs to show the
|
||||
engine's rise back in the dark band; a `cooling.*` catalog case with
|
||||
an armed CW load; and if that is not enough, the void-on-emission
|
||||
design with the tube as its own flow tracer.
|
||||
Open question, the offset's source: the timing points at the airflow
|
||||
drive (the step lands one sample after the fans go to run duty, before
|
||||
any HV, and lifts when they go idle, long after the tube is dark), but
|
||||
high-voltage energy coupling into the lines between the sensors and
|
||||
the ADC is the other candidate and a shared path could show both; a
|
||||
scope on the two sensor lines through a session, fans and tube
|
||||
switched separately, decides.
|
||||
23. **Laser power-good: what the line means.** `cnc/laser_pgood` and its
|
||||
sampled count are defined in the UAPI (active low, one sample every
|
||||
~3.9 ms), the facts bank records that the sampled count reads 0 through
|
||||
real cutting, and the cooling engine warns
|
||||
`laser power-good degraded during the armed window` whenever fewer
|
||||
than half the samples read low, so the warning fires at every session
|
||||
open and carries no information. Nobody knows what the line reports
|
||||
on this PSU: whether it is the supply's own power-good, an HV-present
|
||||
flag, a polarity we have inverted, or unconnected. Owed: the line on a
|
||||
scope against `hv_current` through an armed cut, its meaning written
|
||||
into the facts bank and the UAPI, and then either a warning that means
|
||||
something or no warning.
|
||||
|
||||
**Deliberately not gated:** an armed GRBL job after an underrun cuts at the
|
||||
stale origin unless homing is required (GRBL mode permits unhomed cutting; the
|
||||
|
||||
@@ -4226,6 +4226,88 @@ warned by the engine at every session open, a separate item. The check
|
||||
window's own baseline and the tube term are the two candidates the fix
|
||||
chooses between; nothing is built yet.
|
||||
|
||||
## 2026-08-29: the arm-skip and RX-overrun fix, host-proven
|
||||
|
||||
The driver fix for BRINGUP "Next work" item 20 is written in
|
||||
grblHAL-glowforge and proven on the host; it is not yet on an image.
|
||||
|
||||
**The arm.** `spindleSetState` now arms on `state.on && !laser_ok`: the
|
||||
consent question reads the window alone, never the previous spindle state.
|
||||
`gflaser_disarm` leaves the spindle-state record alone, since it is the
|
||||
core's own view (`spindleGetState`, the `A:S` field, planner sync) and the
|
||||
condition no longer depends on it. `tests/laser_arm_test.c` gained case H:
|
||||
arm through the press, bump the sender generation, `gflaser_poll` closes
|
||||
the window with the record still on, the next laser-on must run the button
|
||||
wait again and arm; and case I: a laser-on inside the open window does not
|
||||
re-prompt. On the old condition case H fails three checks; on the new one
|
||||
the whole harness passes.
|
||||
|
||||
**The ring.** In `serial.c`, `rx_byte` on a full ring now drops the
|
||||
overrunning line whole: what the ring already holds of it is unwritten back
|
||||
to the last newline, the rest is discarded through the line's own newline,
|
||||
real-time characters keep passing (they are taken before the ring), and
|
||||
the overrun is latched. The driver's realtime hook takes it once, logs it,
|
||||
reports `RX overrun: the sender ignored flow control (Bf:); job aborted` to
|
||||
the sender and enqueues `^X`, the same stop as the lid cancel: controlled
|
||||
deceleration, latch relocked, alarm. `tests/serial_test.c` (new, in CMake
|
||||
and CI) pushes 73 lines of 14 bytes, overruns on the 74th with a `?` in
|
||||
the middle, and checks: one byte free after 1022, the `?` taken, the
|
||||
overrun reported once and only once, every line that fit delivered whole,
|
||||
no fragment left behind, the next line after the overrun whole, and the
|
||||
same with the overrun landing mid-line; 11 checks pass.
|
||||
|
||||
**The null-sink harness** (`laser_lifecycle_test.py`, over TCP, no
|
||||
hardware) gained two scenarios and passes 15 of 15: `sender-change-mid-job`
|
||||
(M4, a 5 s move, the socket closed at 1 s with the spindle on, reconnect,
|
||||
`M3 S100` must prompt and re-arm; the disarm message itself is written while
|
||||
no client is connected and is discarded, so the re-arm is the evidence) and
|
||||
`rx-overrun` (an armed job, then 120 lines written at once: the overrun
|
||||
report arrives, the state goes to Alarm, the window closes, and after `$X`
|
||||
a clean job arms again). `laser_stream_test.py` still passes.
|
||||
|
||||
**What a sender change means in Grbl terms**, for BRINGUP item 21: neither
|
||||
Grbl nor grblHAL knows a sender is present; a lost connection leaves the
|
||||
controller executing what its planner and RX ring hold, then waiting; the
|
||||
core's `stream_disconnect` only switches streams; senders treat the loss as
|
||||
a failed job. ForgeFIRM keeps that for the motion and adds the disarm.
|
||||
|
||||
## 2026-08-29: the flow check's reading, host-proven
|
||||
|
||||
The cooling engine's flow check (forgectrl `cool.c`) now reads its rise
|
||||
from means and takes the tube's share off before the limit; written and
|
||||
proven on the host, not yet on an image (BRINGUP item 22).
|
||||
|
||||
**The reading.** The baseline is the mean of the settled window the gate
|
||||
has just verified (15 samples at 1 Hz), and that history restarts when the
|
||||
run airflow profile is applied, so the window is taken entirely under the
|
||||
profile and the ADC offset that comes with it sits on both sides of the
|
||||
rise; the arm-time check therefore starts about 15 s after the session
|
||||
opens instead of one second after. The end reading is the mean of the
|
||||
check's last 5 s. The tube's share is one coefficient per power model
|
||||
(`cool_laser_heat_cw` 3.06e-5, `cool_laser_heat_density` 2.36e-5 C per
|
||||
raw-second of `pic/hv_current`, the numbers of the 2026-08-29 burst runs)
|
||||
times the current integral from 15 s before the window to 15 s before its
|
||||
end (the heat's lag to the sensor; emission later than that has not
|
||||
arrived, so it is not counted, the safe side), bounded at 3 C so no setting
|
||||
can subtract the check away. The verdict lines carry the share and the raw
|
||||
rise: `coolant flow verified (heater rise 11.8 C, dT 10.7 C; laser 1.5 off
|
||||
13.2)`. The two keys are validated in `main.c` (0 to 2e-4) and described in
|
||||
`SERVICES.md`; the diagnostics' own flow-verify and flow-calibrate are
|
||||
untouched, since they run with the tube dark.
|
||||
|
||||
**The proof.** `tests/cool_flow_test.c` (new, in CMake and CI) includes the
|
||||
engine source against a fake sysfs tree and a fake clock, with a loop model
|
||||
that carries the run-profile offset (-1 C stepping in at the session open
|
||||
and toggling 0.6 C), the heater's rise with flow (12 C plateau) or without
|
||||
(0.4 C per second) and the tube's heat arriving 15 s after emission. Fifteen
|
||||
checks pass: a dark check with flow is verified with no share and its
|
||||
baseline is the window's mean; a dark check without flow is SUSPECT; a lit
|
||||
CW check with flow is verified with about 1.5 C taken off (raw 13.2, judged
|
||||
11.8); a lit check without flow is SUSPECT (20.2 raw, 18.8 judged); an
|
||||
absurd coefficient is bounded at 3 C and no flow is still SUSPECT (17.2);
|
||||
under the density model the density coefficient applies (1.1 off). The
|
||||
`flowload` drill's verdict parser accepts the new suffix.
|
||||
|
||||
## Superseded status notes
|
||||
|
||||
### Shared machine services — remaining polish, as listed 2026-08-13
|
||||
|
||||