Retire next-work item 3: the shared-services polish is closed as a set
Diagnostics run as an engine mode behind cool_diag_take/release, the HTTP surface carries its accept caps with bounded camera setup children, and the busy-state arbitration is declined with its reasoning (CAMPAIGN-LOG has the proof runs and the two cross-check lessons the queue taught). BRINGUP: the item closed, items 4 and up move down one.
This commit is contained in:
+17
-33
@@ -355,7 +355,7 @@ factory 2.6.0-2228 session; measured numbers in the facts bank).
|
||||
alike: the retrace is sized to `cnc/max_backtrack` and the lead follows it,
|
||||
so a pause with little history behind it shortens both rather than failing.
|
||||
GRBL mode uses feed hold / cycle start, so a resumed GRBL cut picks up where
|
||||
the deceleration ended (item 10). A pause is not a cancel: the latch
|
||||
the deceleration ended (item 9). A pause is not a cancel: the latch
|
||||
stays unlocked and the window open across it. There is no resume dwell: the
|
||||
safing chain re-arms ~216 ms before the first step (facts bank).
|
||||
- **`lid_policy = hold`** selects stock grblHAL door behavior instead (park in
|
||||
@@ -1110,35 +1110,19 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
reachable-mode reasoning and the factory fallback configuration are in
|
||||
the headers of kernel patches 0011-0013 (`meta-glowforge-bsp`,
|
||||
`recipes-kernel/linux/`).
|
||||
3. **Shared machine services — remaining polish.** None of it blocking:
|
||||
- **Diagnostics as engine modes.** The flow tools still drive the thermal
|
||||
hardware themselves while the engine suspends its writes; the check
|
||||
parameters are already shared (`cool.h`), so what remains is folding the
|
||||
tools into the engine and retiring the suspend/resume dance.
|
||||
- **Busy-state arbitration under one lock.** The idle/busy gates (`POST
|
||||
/settings`, `/mode`, diagnostics start, upload/apply) each cross-check
|
||||
`machine_is_idle()` and `update_job_running()` at their own call sites.
|
||||
They fail closed and are drilled, but a single arbiter would close the
|
||||
remaining request-interleaving windows by construction.
|
||||
- **HTTP surface caps.** An explicit `MHD_OPTION_CONNECTION_LIMIT` plus a
|
||||
per-IP cap is the right hardening (a 500-connection flood plateaued at 379
|
||||
fds under the raised 4096 `RLIMIT_NOFILE`, no crash), and the camera
|
||||
`ensure_engine` `popen()`s should move out of the HTTP callback so a slow
|
||||
media-ctl cannot stall the request thread. Changing the MHD start flags
|
||||
touches the streaming model, so this wants a bench slot of its own.
|
||||
4. **Physical-evidence negatives still open.** A present head answering I²C
|
||||
3. **Physical-evidence negatives still open.** A present head answering I²C
|
||||
badly (the K-11 runtime case) and a failed head capture leaving the measure
|
||||
laser off — both need the head connected and a fault injected. Opportunistic:
|
||||
`STATE_FAULT` recovery via `enable` the next time a DRV8825 fault line
|
||||
actually trips.
|
||||
5. **Debug-kernel checks.** Module load/unload under `CONFIG_DEBUG_MUTEXES`
|
||||
4. **Debug-kernel checks.** Module load/unload under `CONFIG_DEBUG_MUTEXES`
|
||||
and a forced `-EPROBE_DEFER` unwind still need a debug kernel build. Both
|
||||
drills cycle what the rail policy avoids: a module unload powers the 40 V
|
||||
rail off (a stepper driver can come out of the power-up unserviceable),
|
||||
and a forced defer needs the 40 V regulator or the SDMA device unbound
|
||||
under the module's probe. This is a bench slot with the rail-cycle gamble
|
||||
accepted, not a quick check.
|
||||
6. **Release acceptance follow-through.** The campaign is the release gate
|
||||
5. **Release acceptance follow-through.** The campaign is the release gate
|
||||
and runs as designed: dev image `20260824230512`, 45 of 45 from nothing,
|
||||
36 of them unattended with the bench actuator in the loop, release
|
||||
authorized (the export is on the board at `/data/forgetest/export/`).
|
||||
@@ -1154,16 +1138,16 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
stay host-side by design, and the registry marks them so. The deferred
|
||||
emulator homing-image smoke is tool work here too, now that the
|
||||
emulator can be pointed at live snapshots. The first
|
||||
release is item 7.
|
||||
7. **Publish.** The first release: `releases/v<version>/acceptance.json`
|
||||
release is item 6.
|
||||
6. **Publish.** The first release: `releases/v<version>/acceptance.json`
|
||||
from the authorized export, `scripts/release.sh`, the kas flip and the
|
||||
first GitHub release, per the site (Developers, "Release flow"), once
|
||||
ready to publish. Repoint the core submodule to
|
||||
upstream if the `step_us_min` sizing fix merges.
|
||||
8. **Update system Phase 5 — recovery refresh.** The remaining phase of
|
||||
7. **Update system Phase 5 — recovery refresh.** The remaining phase of
|
||||
`docs/UPDATE-SYSTEM.md` (a refreshed recovery image in boot0); Phases 0–4
|
||||
are done.
|
||||
9. **Head-IRQ source validation — beam-emission hypothesis (exploratory, not
|
||||
8. **Head-IRQ source validation — beam-emission hypothesis (exploratory, not
|
||||
gating).** The EV_SW `head` bit (GPIO3_22, factory pad HEAD_IRQ) is the head
|
||||
MCU's attention line — idle LOW with a healthy head, pulsing on head reboot,
|
||||
floating to the SoC pull-up with no head — so the raw level is not a
|
||||
@@ -1179,7 +1163,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
log EV_SW head-bit edges plus `head/beam_detect_digital|_analog` while
|
||||
firing.
|
||||
|
||||
10. **Gapless pause and resume in GRBL mode (planned).** A pause leaves a mark
|
||||
9. **Gapless pause and resume in GRBL mode (planned).** A pause leaves a mark
|
||||
in the cut. With laser mode on, the core stops the beam at the start of the
|
||||
hold (`disable_laser_during_hold`, on by default), so the head travels the
|
||||
whole deceleration dark, and the resume re-accelerates from a standstill at
|
||||
@@ -1213,7 +1197,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
line does to it, and how it composes with the armed window's disarm grace
|
||||
across a long hold.
|
||||
|
||||
11. **Head crash and rail-contact detector (planned).** The head
|
||||
10. **Head crash and rail-contact detector (planned).** The head
|
||||
accelerometer is the motion-liveness probe and nothing more; the
|
||||
factory runs two tiers off the same sensor (a per-axis alert that
|
||||
pauses, a per-axis abort), and its thresholds arrive in every pulse
|
||||
@@ -1225,7 +1209,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
are established. A pause on contact, on the factory's shape, would be
|
||||
the first use.
|
||||
|
||||
12. **A sender change while a job runs: discussion.** Today a sender that
|
||||
11. **A sender change while a job runs: discussion.** Today a sender that
|
||||
disconnects mid-job leaves the motion running to the end of what the
|
||||
controller holds, with the window closed and fire suppressed (the
|
||||
consent belonged to the displaced session), so the job finishes dark
|
||||
@@ -1242,9 +1226,9 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
a hold parks the head over hot material with the assist air on the run
|
||||
profile, and the grace then closes the window in Hold as it does today;
|
||||
running on leaves a clean stop position but wastes the piece. Decide
|
||||
with the gapless pause and resume item (10), which owns the resume
|
||||
with the gapless pause and resume item (9), which owns the resume
|
||||
mechanics.
|
||||
13. **The flow check while the tube is lit.** The arm-time heater check
|
||||
12. **The flow check while the tube is lit.** The arm-time heater check
|
||||
starts at the session open, so with a prompt press the tube is lit
|
||||
for most of its window, and a lit CW window adds about 1.5 C to the
|
||||
rise (0.5 C at 45 % density) against a 1.6 C margin; on top of that the
|
||||
@@ -1277,7 +1261,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
remains; a scope on the two sensor lines during a cut is the next
|
||||
instrument. It sits inside the ceiling's 2 C hysteresis and the flow
|
||||
check reads means, so it is a measurement item, not a gate item.
|
||||
14. **Laser power-good: what the line means.** `cnc/laser_pgood` and its
|
||||
13. **Laser power-good: what the line means.** `cnc/laser_pgood` and its
|
||||
sampled count are defined in the UAPI (active low, one sample every
|
||||
~3.9 ms), the facts bank records that the sampled count reads 0 through
|
||||
real cutting, and the cooling engine warns
|
||||
@@ -1289,7 +1273,7 @@ Open items only. Anything closed is in `CAMPAIGN-LOG.md`.
|
||||
scope against `hv_current` through an armed cut, its meaning written
|
||||
into the facts bank and the UAPI, and then either a warning that means
|
||||
something or no warning.
|
||||
15. **Initial commissioning: measure and set the machine's own numbers
|
||||
14. **Initial commissioning: measure and set the machine's own numbers
|
||||
methodically.** Every tunable that was measured on the bench machine
|
||||
and shipped as a default varies from machine to machine: the flow
|
||||
check's bands and `cool_flow_rise`, the tube's heat coefficients
|
||||
@@ -1325,8 +1309,8 @@ covers the warm-up hold), the supply temperature window (the service sends
|
||||
the whole ADC range and the factory binds it to nothing; the supply is
|
||||
watched per job instead), the head, lid, interconnect and fused temperature
|
||||
ceilings (no sensor at those locations; the chassis is watched per job), the
|
||||
head accelerometer thresholds (item 11), the lid IR thresholds (the fire
|
||||
head accelerometer thresholds (item 10), the lid IR thresholds (the fire
|
||||
watch runs on local knobs; the header values stay ignored), the
|
||||
HV current caps (the sampled emission witness covers the idle case, and HV
|
||||
current is ranged per job), the thermal report upload conditions and the
|
||||
pump flag. Beam detect stays with item 9.
|
||||
pump flag. Beam detect stays with item 8.
|
||||
|
||||