Prove the controller's published state files
The lifecycle harness gains the state-files scenario: with GF_STATE_DIR at the session workdir, grbl.settings carries the $$ view and follows the derived floor through an M101 switch and its M2 revert, and grbl.state follows the sender connection (a reconnect bumps the generation), the armed window and the dose model, with ts_mono advancing. The panel-serves catalog test asserts the /status grbl block in GRBL mode with a live controller (fresh age, state, sender, laser, modals) and GET /grbl/settings, and its covers name the publisher and the serial layer; the glowforge_status.c covers entry selects nothing until the grblHAL pin moves past the commit that adds the file. The CAMPAIGN-LOG records the build and its proof; BRINGUP describes the mechanism.
This commit is contained in:
@@ -5998,6 +5998,8 @@ Each run: `cool_flow_recheck_s = 600` for the run and removed after, the `dpatch
|
||||
|
||||
Built the same day, host-proven, no fire: the dose-model switch. `M101 P0` (analog) / `M101 P1` (density) as a driver M-code, refused with the spindle commanded on (error 253, reason reported) or the controller not idle, program-scoped with `Q1` to stick; the per-model floors as config keys (`laser_floor_density` 10, `laser_floor_analog` 16) loaded into `$35` in RAM at every arm and switch with the PWM mapping re-precomputed, the stored setting never written; the stream leading the first run after a switch dark; the cooling report carrying the model in force (`model=` on `POST /cool/state`, the engine preferring it to the config key for the tube-heat share); the five `laser_*` keys in forgectrl's settings whitelist and the panel's GRBL tab with help text; `laser.power-floor` made model-aware and the new catalog test `laser.power-model-switch`. Proof: `tests/laser_arm_test.c` cases J to O (derived floors, validate and execute refusals, switch, revert, Q1, reset), `laser_stream_test.py` rules 18 to 21 (a typed `$35` overwritten at the arm; both switch directions rendering exactly at the boundary with no continuous FIRE at full duty across it; the refusal leaving the stream unchanged; `M2` reverting and `Q1` holding), forgectrl's host tests. Found on the way: the core skips every G-code line after an error until the sender resyncs with an empty line or a `$` command (`protocol.c`), which is how the harness now follows a refused switch. One flake, not a defect: rule 13's mask comparison slipped one tick at the tail while a build ran alongside in the same VM (the shipper is wall-paced); three runs alone were identical.
|
||||
|
||||
Built the same evening, host-proven: the controller's published state (the C6 gap, shaped as files by the operator's decision rather than an HTTP push). The controller writes `grbl.settings` and `grbl.state` under `/run/forgefirm` atomically on edges plus a heartbeat; forgectrl echoes the state file in `/status` as the `grbl` block only while its supervisor holds a live GRBL controller, serves the settings file at `GET /grbl/settings`, and the panel's GRBL card renders the sender session, machine state, laser window with its dose model, and the modal report. Proof: the new `status_grbl_test` (fresh, torn, stale and dead-controller cases), the lifecycle harness's state-files scenario (the files follow connect, arm, `M101`, the `M2` revert and a reconnect's generation bump; found on the way - an arm or `M101` moves `$35` in RAM with no settings-changed event, so the publisher watches the value), the full forgectrl host-test sweep, the stream harness, 252 forgetest unit tests and the coverage lint. Not yet on the bench: the board still runs the pre-C6 hot-deployed binaries, so the panel card reads "no report" until the next deploy or image.
|
||||
|
||||
Bench-proven the same day, one armed run of the new `mswitch` drill on the hot-installed cross-built binaries (forgectrl md5 4dc4677a, grblHAL_glowforge 17e5502f, operator-run install): the arm reported "laser armed (density, floor 10 %)", `M5` then `M101 P0` answered ok and reported "laser power model set for this program (analog, floor 16 %)", `$$` read `$35=16` while analog was in force and `$35=10` again after `M2` reported the revert, the armed window carried across the switch with no re-prompt, and the 25 Hz trace showed exactly two discharge segments, the density line pulsed (hv mean 390, max-mean 547) and the analog line steady (mean 567, max-mean 28), dark after the second `M5` (hv max 0). Board cleaned; the hot-deployed binaries stay until the next flash, `/tmp/*.prev` is the rollback.
|
||||
|
||||