Files
esh-pfi-infrastructure/graphify-out
vh 7142657749 memory: snapshot — gx10 unracked and next up as an inference+training box
Run 3c's new intended home is the GX10 rather than a power triage on ana-ml2: a ~240 W
appliance instead of the kilowatt-class box that tripped the breaker, and 121 GB unified
holds the 49 GB bf16 base comfortably where ana-ml2 was tight. The box is bare, so the
first move is a throughput probe rather than a harness port.

Also banked: the Ada migration settling on zfs send with branch (b) ruled out by irv-ml1
keeping its eight services; the Synapse 39-release upgrade with its one-way schema
migration, the appservice namespace opening and the admin API lockdown; the ratified room
alias convention; and a named failure class — a correct check aimed at the wrong object —
with six instances from one day across three sessions.
2026-09-01 16:32:21 -07:00
..