Files
esh-pfi-infrastructure/docs/pfi
vh 377f8a43c8 docs(reranker): record cutover VERIFIED + v13 gate PASS, A2 teardown, throughput
Brokkr independent verify clean (maxdiff 0.000000, no split). R42 v13
acceptance gate PASSES first time in its history: main+kb 56/90->90/90,
evictions 33->0. A2 control torn down. A3 throughput characterized at
~34 req/s (graceful queueing), with A4/util-bump/replica as levers.
2026-08-06 10:49:50 -07:00
..