Rewrites the in-flight section: run 1's seat is down, run 2 is up on :8098, and
the base decision the previous snapshot recorded as OPEN is resolved (stock
instruct, operator 2026-08-25).
Four new decisions, and the detail file carries the arc: the two operator calls
that produced run 2, all five gates, the harness commit chain, and the caveat
that its own provenance names a commit AHEAD of the code that ran.
Records three things a future session would otherwise get wrong:
- the mask is proven by the loss-token delta, NOT by the matching p50 step
times -- step time is insensitive to which positions carry loss, so that
check cannot go red on the axis I originally cited it for
- two bf16 26B arms do not fit on one 97.9 GB card (98 GB of weights before
any KV cache), so brokkr's both-arms-in-one-window requirement is a GPU
resourcing call, not a scheduling one
- erp-tune-v1 is still registered in the gateway and returns HTTP 500; the
fix needs a config edit plus a reload that interrupts fleet traffic, so it
is batched for morning rather than done at 2am