memory: augaman deploy closed out by augaman-dev; gallery empty and ready for real enrollments

This commit is contained in:
vh
2026-09-27 00:09:13 -07:00
parent d8f59a15d9
commit 2cd5048447
+4
View File
@@ -151,6 +151,10 @@ _As of 2026-09-26 ~1620 PT._
daily 0100 PT → rest-server-ana `esh-ml1/`, fail-closed hook, secrets vaulted under daily 0100 PT → rest-server-ana `esh-ml1/`, fail-closed hook, secrets vaulted under
`esh-ml1/etc/restic/`. Identity-level restore matched the live gallery (canary, `esh-ml1/etc/restic/`. Identity-level restore matched the live gallery (canary,
snapshot `fd3061a1`). **The backup gate for real enrollments is MET.** snapshot `fd3061a1`). **The backup gate for real enrollments is MET.**
- **Deploy CLOSED by augaman-dev 2026-09-27 0009 PT:** HTTP checks passed; the canary
survived the recreate and was then deleted, so the gallery is empty and ready for real
enrollments. `/recognize` p50 186 ms (1080p, one face). The detector-latency follow-up
is theirs. Their next release pins the container gid to 10001; nothing is owed by infra-ops.
### esh-ml1 ### esh-ml1