memory: augaman deploy closed out by augaman-dev; gallery empty and ready for real enrollments
This commit is contained in:
@@ -151,6 +151,10 @@ _As of 2026-09-26 ~1620 PT._
|
||||
daily 0100 PT → rest-server-ana `esh-ml1/`, fail-closed hook, secrets vaulted under
|
||||
`esh-ml1/etc/restic/`. Identity-level restore matched the live gallery (canary,
|
||||
snapshot `fd3061a1`). **The backup gate for real enrollments is MET.**
|
||||
- **Deploy CLOSED by augaman-dev 2026-09-27 0009 PT:** HTTP checks passed; the canary
|
||||
survived the recreate and was then deleted, so the gallery is empty and ready for real
|
||||
enrollments. `/recognize` p50 186 ms (1080p, one face). The detector-latency follow-up
|
||||
is theirs. Their next release pins the container gid to 10001; nothing is owed by infra-ops.
|
||||
|
||||
### esh-ml1
|
||||
|
||||
|
||||
Reference in New Issue
Block a user