mirror of
https://github.com/jokob-sk/NetAlertX.git
synced 2025-12-07 09:36:05 -08:00
CR/LF correction
This commit is contained in:
277
front/lib/fullcalendar-scheduler/CHANGELOG.txt
Normal file
277
front/lib/fullcalendar-scheduler/CHANGELOG.txt
Normal file
@@ -0,0 +1,277 @@
|
||||
|
||||
v1.9.4 (2018-03-27)
|
||||
-------------------
|
||||
|
||||
Require fullcalendar 3.9.x, solving #4089
|
||||
|
||||
|
||||
v1.9.3 (2018-03-04)
|
||||
-------------------
|
||||
|
||||
- error second time changing to timeline view with resource-specific business hours (#414)
|
||||
- typescript definition doesn't expose OptionsInput (#421)
|
||||
- expose typescript defs for ResourceInput & ResourceSourceInput
|
||||
|
||||
|
||||
v1.9.2 (2018-01-23)
|
||||
-------------------
|
||||
|
||||
Bugfixes:
|
||||
- fix event resize highlight not being unrendered (#406)
|
||||
- vert resource view fast navigation with refetchResourcesOnNavigate, breaks ([core-4009])
|
||||
- long-press touch selecting one event after another, gets confused (#410)
|
||||
- firstDay option not considered when slotLabelInterval is days (#408)
|
||||
- TypeScript definition file not compatible with noImplicitAny (#405)
|
||||
|
||||
[core-4009]: https://github.com/fullcalendar/fullcalendar/issues/4009
|
||||
|
||||
|
||||
v1.9.1 (2017-12-18)
|
||||
-------------------
|
||||
|
||||
- exposed MAX_TIMELINE_SLOTS (#47)
|
||||
- TypeScript definition file (scheduler.d.ts) included in npm package (#213)
|
||||
- CoffeeScript within codebase converted to TypeScript
|
||||
- more robust testing environment
|
||||
|
||||
|
||||
v1.9.0 (2017-11-13)
|
||||
-------------------
|
||||
|
||||
Bugfixes:
|
||||
- when navigating prev/next using resource column grouping, renders duplicate resources (#380)
|
||||
- when navigating prev/next, prevent unnecessary resource rerenders (introduced in v1.8.0)
|
||||
- `addResource` with parentId does not render with correct nesting (#379)
|
||||
- `resourcesInitiallyExpanded` not compatible with resource groups (#378)
|
||||
- switching to view with async resources, nowIndicator causes JS error ([core-3918])
|
||||
|
||||
[core-3918]: https://github.com/fullcalendar/fullcalendar/issues/3918
|
||||
|
||||
|
||||
v1.8.1 (2017-10-23)
|
||||
-------------------
|
||||
|
||||
Bugfixes:
|
||||
- `resourceGroupField` not working (#370)
|
||||
- timeline slot headers would not render in localized text (#367)
|
||||
- fc-content-skeleton DOM element would repeatedly render on navigation in
|
||||
vertical resource view (#363)
|
||||
|
||||
|
||||
v1.8.0 (2017-10-10)
|
||||
-------------------
|
||||
|
||||
Features:
|
||||
- `resourcesInitiallyExpanded` set to `false` for collapsing by default (#40)
|
||||
- performance gains with positioning/sizing (#277, #320) thx @MartijnWelker
|
||||
|
||||
Bugfixes:
|
||||
- `updateEvent` makes events disappear (#350)
|
||||
- `addResource` scrollTo param broken (#335)
|
||||
- `filterResourcesWithEvents` considers current view's range (#334)
|
||||
|
||||
Incompatibilities:
|
||||
- Vertical resource view (agenda or basic), when waiting to receive asynchronous
|
||||
event sources, previously would render generic date columns as placeholders.
|
||||
Now, empty rectangles will simply be rendered.
|
||||
|
||||
|
||||
v1.7.1 (2017-09-06)
|
||||
-------------------
|
||||
|
||||
- vertical divider in timeline view in bootstrap3 theme ugly (#341)
|
||||
- render all helper elements while DnD, an event w/ multiple resourceIds (#155)
|
||||
- Composer.json fixes, Packagist now working
|
||||
|
||||
|
||||
v1.7.0 (2017-08-30)
|
||||
-------------------
|
||||
|
||||
- Bootstrap 3 theme support (more info in [core release notes][core-3.5.0])
|
||||
- fixed resources businessHours leak in other views (#204)
|
||||
- fixed timeline business hours on single day not rendered (#299)
|
||||
|
||||
[core-3.5.0]: https://github.com/fullcalendar/fullcalendar/releases/tag/v3.5.0
|
||||
|
||||
|
||||
v1.6.2 (2017-04-27)
|
||||
-------------------
|
||||
|
||||
- composer.js for Composer (PHP package manager) (#291)
|
||||
- fixed removed background events coming back when collapsing & expanding a resource (#295)
|
||||
- fixed refetchResourcesOnNavigate with refetchResources not receiving start & end (#296)
|
||||
- internal refactor of async systems
|
||||
|
||||
|
||||
v1.6.1 (2017-04-01)
|
||||
-------------------
|
||||
|
||||
Bugfixes (code changes in v3.3.1 of core project):
|
||||
- stale calendar title when navigate away from then back to the a view
|
||||
- js error when gotoDate immediately after calendar initialization
|
||||
- agenda view scrollbars causes misalignment in jquery 3.2.1
|
||||
- navigation bug when trying to navigate to a day of another week
|
||||
- dateIncrement not working when duration and dateIncrement have different units (#287)
|
||||
|
||||
|
||||
v1.6.0 (2017-03-23)
|
||||
-------------------
|
||||
|
||||
Adjustments to accommodate all date-related features in core v3.3.0, including:
|
||||
- `visibleRange` - complete control over view's date range
|
||||
- `validRange` - restrict date range
|
||||
- `changeView` - pass in a date or visibleRange as second param
|
||||
- `dateIncrement` - customize prev/next jump (#36)
|
||||
- `dateAlignment` - custom view alignment, like start-of-week
|
||||
- `dayCount` - force a fixed number-of-days, even with hiddenDays
|
||||
- `disableNonCurrentDates` - option to hide day cells for prev/next months
|
||||
|
||||
Bugfixes:
|
||||
- event titles strangely positioned while touch scrolling in Timeline (#223)
|
||||
|
||||
|
||||
v1.5.1 (2017-02-14)
|
||||
-------------------
|
||||
|
||||
- dragging an event that lives on multiple resources should maintain the
|
||||
non-dragged resource IDs when dropped (#111)
|
||||
- resources function/feed should receive start/end params (#246)
|
||||
(when `refetchResourcesOnNavigate` is true)
|
||||
- iOS 10, unwanted scrolling while dragging events/selection (#230)
|
||||
- timeline, clicking scrollbars triggers dayClick (#256)
|
||||
- timeline, external drag element droppable when outside of calendar (#256)
|
||||
|
||||
|
||||
v1.5.0 (2016-12-05)
|
||||
-------------------
|
||||
|
||||
- dynamically refetch resources upon navigation (#12):
|
||||
- `refetchResourcesOnNavigate`
|
||||
- only display resources with events (#98):
|
||||
- `filterResourcesWithEvents`
|
||||
- `navLinks` support (#218)
|
||||
- timeline vertical scrolling wrongly resetting (#238)
|
||||
- missing bottom border on last resource (#162)
|
||||
- businessHours occupying whole view wouldn't display (#233)
|
||||
- text-decoration on event elements lost when scrolling (#229)
|
||||
- fc-today and other day-related classes in timeline header cells
|
||||
- fix touch scrolling glitchiness regression
|
||||
- made gulp-based build system consistent with core project
|
||||
- as with the corresponding core project release, there was an internal refactor
|
||||
related to timing of rendering and firing handlers. calls to rerender the current
|
||||
date-range/events/resources from within handlers might not execute immediately.
|
||||
instead, will execute after handler finishes.
|
||||
|
||||
|
||||
v1.4.0 (2016-09-04)
|
||||
-------------------
|
||||
|
||||
- `eventResourceEditable` for control over events changing resources (#140)
|
||||
- `eventConstraint` accepts `resourceId` or `resourceIds` (#50)
|
||||
- `eventAllow`, programmatic control over event dragging (#50)
|
||||
- `selectAllow`, programmatic control over allowed selection
|
||||
- adjustments to work with v3 of the core project
|
||||
|
||||
|
||||
v1.3.3 (2016-07-31)
|
||||
-------------------
|
||||
|
||||
- business hours per-resource (#61)
|
||||
- fix non-business days without styles (#109)
|
||||
- fix bug with scrollbars causing selection after the first (#192)
|
||||
- certain rendering actions, such as initial rendering of a resource view,
|
||||
would not always execute synchronously once jQuery 3 was introduced.
|
||||
fixes have been made to ensure synchronous execution with jQuery 3.
|
||||
- integration with TravisCI
|
||||
|
||||
|
||||
v1.3.2 (2016-06-02)
|
||||
-------------------
|
||||
|
||||
- refetchResources and view switching causes blank screen (#179)
|
||||
- UMD definition for Node, defined core dependency (#172)
|
||||
- setResources should return an array copy (#160)
|
||||
- revertFunc misbehaves for events specified with multiple resourceIds (#156)
|
||||
- nowIndicator sometimes incorrectly positioned on wide screens (#130)
|
||||
- memory leak upon destroy (#87)
|
||||
|
||||
|
||||
v1.3.1 (2016-05-01)
|
||||
-------------------
|
||||
|
||||
- events offset by minTime in timelineWeek view (#151)
|
||||
- icons for prev/next not working in MS Edge
|
||||
|
||||
|
||||
v1.3.0 (2016-04-23)
|
||||
-------------------
|
||||
|
||||
touch support introduced in core v2.7.0
|
||||
|
||||
|
||||
v1.2.1 (2016-02-17)
|
||||
-------------------
|
||||
|
||||
- allow minTime/maxTime to be negative or beyond 24hrs in timeline (#112)
|
||||
- fix for nowIndicator not updating position on window resize (#130)
|
||||
- fix for events resourceId/resourceIds being non-string integers (#120)
|
||||
- fix external drag handlers not being unbound (#117, #118)
|
||||
- fix refetchResources should rerender resources in vertical view (#100)
|
||||
- fix events incorrectly rendered when clipped by minTime/maxTime (#96)
|
||||
- fix resourceRender's resource object param when resources above dates (#91)
|
||||
- fix eventOverlap:false with eventResourceField (#86)
|
||||
- fix license key warning being rendered multiple times (#75)
|
||||
- fix broken Resource Object eventClassName property
|
||||
- fix separate event instances via multiple resourceIds, wrong color assignment
|
||||
|
||||
|
||||
v1.2.0 (2016-01-07)
|
||||
-------------------
|
||||
|
||||
- current time indicator (#9)
|
||||
- resourceIds, allows associating an event to multiple resources (#13)
|
||||
- pass resourceId into the drop event (#27)
|
||||
- fix for refetchEvents reseting the scroll position (#89)
|
||||
- fix for addResource/removeResource failing to rerender in vertical views (#84)
|
||||
- fix for timeline resource rows sometimes being misaligned when column grouping (#80)
|
||||
- fix for timeline events not rendering correctly when minTime specified (#78)
|
||||
- fix for erradic resource ordering in verical views when no resourceOrder specified (#74)
|
||||
- fix bug where external event dragging would not respect eventOverlap (#72)
|
||||
|
||||
|
||||
v1.1.0 (2015-11-30)
|
||||
-------------------
|
||||
|
||||
- vertical resource view (#5)
|
||||
- fix event overlap not working in day/week/month view (#24)
|
||||
|
||||
|
||||
v1.0.2 (2015-10-18)
|
||||
-------------------
|
||||
|
||||
- incorrect rendering of events when using slotDuration equal to one day (#49)
|
||||
- minimum jQuery is now v1.8.0 (solves #44)
|
||||
- more tests
|
||||
|
||||
|
||||
v1.0.1 (2015-10-13)
|
||||
-------------------
|
||||
|
||||
- fix event rendering coordinates when timezone (#15)
|
||||
- fix event rendering in non-expanded non-rendered resource rows (#30)
|
||||
- fix accidentally caching result of resource fetching (#41)
|
||||
- fix for dragging between resources when custom eventResourceField (#18)
|
||||
- fix scroll jumping bug (#25)
|
||||
- relax bower's ignore (#21)
|
||||
|
||||
|
||||
v1.0.0 (2015-08-17)
|
||||
-------------------
|
||||
|
||||
Issues resolved since v1.0.0-beta:
|
||||
[2523], [2533], [2534], [2562]
|
||||
|
||||
[2523]: https://code.google.com/p/fullcalendar/issues/detail?id=2523
|
||||
[2533]: https://code.google.com/p/fullcalendar/issues/detail?id=2533
|
||||
[2534]: https://code.google.com/p/fullcalendar/issues/detail?id=2534
|
||||
[2562]: https://code.google.com/p/fullcalendar/issues/detail?id=2562
|
||||
Reference in New Issue
Block a user