UI Improvements
This commit is contained in:
@@ -73,23 +73,19 @@ Acceptance criteria: [What "done" looks like — specific and checkable]
|
||||
Constraints: [Style guide, length limits, technical requirements, approach limits]
|
||||
```
|
||||
|
||||
**Operations Deliverable (returned to Miranda):**
|
||||
**Report to Miranda (required return format):**
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
OPERATIONS DELIVERABLE
|
||||
From: Cole | Director of Operations
|
||||
Task ID: [T-ID]
|
||||
Date: [YYYY-MM-DD]
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — what was delivered and whether it met acceptance criteria. Note any deviations from brief.]
|
||||
|
||||
Output:
|
||||
[Attached or inline deliverable]
|
||||
FINDINGS:
|
||||
[Full deliverable — inline or clearly labelled. Include acceptance criteria met (YES / PARTIAL / NO) and any deviations from scope.]
|
||||
|
||||
Acceptance criteria met: [YES | PARTIAL | NO]
|
||||
If PARTIAL or NO: [Specific criteria not met and reason]
|
||||
|
||||
Deviations from brief:
|
||||
[What changed from the original scope, if anything — or NONE]
|
||||
|
||||
Agents used: [OPS-### list with subtask assignments]
|
||||
OPEN ITEMS: [Criteria not met, scope deviations requiring approval, blockers — or NONE]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user