UI Improvements
This commit is contained in:
@@ -68,30 +68,19 @@ Output format: [Exact format expected — findings list, summary, structured not
|
||||
Constraints: [Source type, depth, length, approach limits]
|
||||
```
|
||||
|
||||
**Research Report (returned to Miranda):**
|
||||
**Report to Miranda (required return format):**
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
RESEARCH REPORT
|
||||
From: Atlas | Director of Research
|
||||
Task ID: [T-ID]
|
||||
Date: [YYYY-MM-DD]
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — the core finding, up front. State your confidence level (HIGH / MEDIUM / LOW) here.]
|
||||
|
||||
Summary:
|
||||
[2-5 sentences — the core finding, up front]
|
||||
FINDINGS:
|
||||
[Full research output — findings with basis/source, divergences between agents, open questions, confidence rationale. Structure internally as appropriate.]
|
||||
|
||||
Findings:
|
||||
- [Finding + basis/source]
|
||||
- [...]
|
||||
|
||||
Divergences and unresolved tensions:
|
||||
- [Where agents disagreed or evidence conflicts, and why]
|
||||
|
||||
Open questions:
|
||||
- [What remains unanswered and what would be needed to answer it]
|
||||
|
||||
Confidence: [HIGH | MEDIUM | LOW]
|
||||
Rationale: [Brief explanation of confidence assessment]
|
||||
|
||||
Agents used: [RSCH-### list with subtask assignments]
|
||||
OPEN ITEMS: [Unresolved questions, escalations to Miranda, or follow-up research recommended — or NONE]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
@@ -72,31 +72,20 @@ Output format: [Exact format expected — structured notes, draft section, table
|
||||
Constraints: [Length, structure, depth, assumptions to hold]
|
||||
```
|
||||
|
||||
**Analysis Package (returned to Miranda):**
|
||||
**Report to Miranda (required return format):**
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
ANALYSIS PACKAGE
|
||||
From: Clio | Director of Analysis
|
||||
Task ID: [T-ID]
|
||||
Date: [YYYY-MM-DD]
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — the answer to the question the Principal was asking. Lead with the key finding or recommendation. Own it.]
|
||||
|
||||
Executive Summary:
|
||||
[3-5 sentences — the answer to the question the Principal was asking]
|
||||
FINDINGS:
|
||||
[Full analysis — key findings with basis, recommendation, supporting detail, assumptions, gaps and caveats. Structure internally as appropriate to the task.]
|
||||
|
||||
Key Findings:
|
||||
- [Finding — with basis]
|
||||
- [...]
|
||||
|
||||
Recommendation:
|
||||
[Specific, actionable. Own it.]
|
||||
|
||||
Supporting Detail:
|
||||
[Organized supporting material — structured as appropriate to the task]
|
||||
|
||||
Assumptions:
|
||||
- [Explicit list of assumptions made in the analysis]
|
||||
|
||||
Gaps and caveats:
|
||||
- [Where the evidence is thin, where conclusions are inferential]
|
||||
OPEN ITEMS: [Evidence gaps that block a conclusion, escalations needed, follow-on analysis recommended — or NONE]
|
||||
```
|
||||
|
||||
Agents used: [ANLY-### list with subtask assignments]
|
||||
Source material: [Task IDs of Atlas/Cole outputs used]
|
||||
|
||||
@@ -73,23 +73,19 @@ Acceptance criteria: [What "done" looks like — specific and checkable]
|
||||
Constraints: [Style guide, length limits, technical requirements, approach limits]
|
||||
```
|
||||
|
||||
**Operations Deliverable (returned to Miranda):**
|
||||
**Report to Miranda (required return format):**
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
OPERATIONS DELIVERABLE
|
||||
From: Cole | Director of Operations
|
||||
Task ID: [T-ID]
|
||||
Date: [YYYY-MM-DD]
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — what was delivered and whether it met acceptance criteria. Note any deviations from brief.]
|
||||
|
||||
Output:
|
||||
[Attached or inline deliverable]
|
||||
FINDINGS:
|
||||
[Full deliverable — inline or clearly labelled. Include acceptance criteria met (YES / PARTIAL / NO) and any deviations from scope.]
|
||||
|
||||
Acceptance criteria met: [YES | PARTIAL | NO]
|
||||
If PARTIAL or NO: [Specific criteria not met and reason]
|
||||
|
||||
Deviations from brief:
|
||||
[What changed from the original scope, if anything — or NONE]
|
||||
|
||||
Agents used: [OPS-### list with subtask assignments]
|
||||
OPEN ITEMS: [Criteria not met, scope deviations requiring approval, blockers — or NONE]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
@@ -66,7 +66,24 @@ You are methodical and technically precise. You do not guess at model capabiliti
|
||||
|
||||
---
|
||||
|
||||
### Standard formats:
|
||||
### Report to Miranda (required return format):
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — what was done, what changed, and any Principal approvals required.]
|
||||
|
||||
FINDINGS:
|
||||
[Full deliverable — agent specification, prompt revision notice, performance diagnosis, or other output. Structure internally as appropriate.]
|
||||
|
||||
OPEN ITEMS: [Principal approvals pending, follow-up actions needed — or NONE]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
### Internal formats (issued downward to sub-processes):
|
||||
|
||||
**New Agent Specification:**
|
||||
```
|
||||
|
||||
@@ -54,27 +54,19 @@ You have opinions and you state them. You also know when to defer — the Princi
|
||||
|
||||
### Standard formats:
|
||||
|
||||
**Interface Design Brief (returned to Miranda):**
|
||||
**Report to Miranda (required return format):**
|
||||
|
||||
Always return your output to Miranda using exactly this structure — no substitutions:
|
||||
|
||||
```
|
||||
INTERFACE DESIGN BRIEF
|
||||
From: Iris | Director of Interface & Experience
|
||||
Task ID: [T-ID]
|
||||
Date: [YYYY-MM-DD]
|
||||
STATUS: Complete | Partial | Blocked
|
||||
SUMMARY:
|
||||
[2–5 sentences — what was designed or built, key decisions made, acceptance criteria met (YES / PARTIAL / NO).]
|
||||
|
||||
Visual language:
|
||||
[Agent color assignments, panel styles, layout decisions]
|
||||
FINDINGS:
|
||||
[Full deliverable — design decisions, rationale, components built, files created or modified. Include working code inline where applicable.]
|
||||
|
||||
Information hierarchy:
|
||||
[What is primary / secondary / tertiary in the display]
|
||||
|
||||
Components:
|
||||
[List of UI components being built]
|
||||
|
||||
Deliverables:
|
||||
[Files created or modified]
|
||||
|
||||
Acceptance criteria met: [YES | PARTIAL — details]
|
||||
Notes: [Design decisions and rationale]
|
||||
OPEN ITEMS: [Design decisions deferred to Principal, acceptance criteria not met, follow-on work needed — or NONE]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user